BIM levels of development
Building Information Modelling (BIM) is a very broad term that describes the process for specifying, creating, and managing digital information about a built asset such as a building, bridge, highway or tunnel.
BIM levels of development (LOD) refers to the degree of accuracy, intricacy or granularity of the model or design. In general these LODs include LOD 100, LOD 200, LOD 300, LOD 400 and LOD 500.
BIM LOD was first introduced by the American Institute of Architects (AIA) in 2008, it defined five levels of development to describe the level of detailing appropriate for early to later stages of a project. In the UK a similar approach might be considered as relating the BIM model to the stages of the RIBA plan of work. Fore further information visit the page overlays to the RIBA plan of work, in particular the BIM overlay.
Fundamentally, the purpose of BIM is to ensure that appropriate information is created in a suitable format at the right time so that better decisions can be made throughout the design, construction and operation of built assets. It is not about creating a 3D model on its own or an add-on to the model, it is a fundamentally different way of running a project from the early stages through to occupation, maximising digital capabilities. The amount of data associated with the model is referred to as the dimension or sometimes level when referring to complexity or capabilities.
ISO 19650:2019 defines BIM as the: 'Use of a shared digital representation of a built asset to facilitate design, constructionand operation processes to form a reliable basis for decisions.'
The BIM levels of development (BIM LOD) are:
- LOD 100 describes concept design stages, essentially the equivalent of hand-sketched or, symbolic digital 2Drepresentations of the design-build project.
- LOD 200 describes the schematic design stage where a partially defined idea with approximate project sizing, form and building elements are established.
- LOD 300 describes the detail stage of a project whereby a 3D digital model represents the building in terms of architectural design and engineering drawings with more exact localised dimensions and elements.
- LOD 350 is essentially a halfway stage between detailing and fabrication, a point where tools suich as clash detectionare employed to ensure individual elements are sychronised into the whole, resolving co-ordination issues and inconsistencies to produce a construction ready model.
- LOD 400 is the last stage of modelling before fabrication and assembly. The model must contain an accuraterepresentation of the elements, objects and thus building with finalised and defined elements, sizes, locations, connections, materials and so on.
- LOD 500 represents the as-built final model of the building with supplementary information such as installationprocesses, installation dates, comments on issues, notes for the users and so on. It is an important element of the process when considering concepts such as the golden thread of information or how the model might used to inform Building Management Systems (BMS) and assist facilities management team after handover. Further tools available via COBie or the Soft Landings process can assist in this.
[edit] Related articles on Designing Buildings
- Asset information model.
- Benefits of manufacturer-created BIM models.
- BIM dimensions.
- BIM execution plan.
- BIM for dummies - an interview.
- Centrally procured public projects.
- Construction Operations Building Information Exchange (COBie).
- CIC BIM Protocol.
- Common data environment.
- Data drops.
- Federated building information model.
- Government Construction Strategy.
- Industry Foundation Classes.
- Information manager.
- Level 2 BIM.
- Level 3 BIM.
- Level of detail.
- Open data.
- PAS 1192-2:2013.
- PAS 1192-3:2014.
- Project information model.
- Uniclass.
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.