Construction (Retention Deposit Schemes) Bill 2017-19
[edit] Introduction
The Construction (Retention Deposit Schemes) Bill 2017-19 is a Private Member’s Bill introduced to Parliament by former charted surveyor Peter Aldous MP on Tuesday 9 January 2018 under the Ten Minute Rule.
Retention is a percentage (often 5%) of the amount certified as due for payment to a contractor that is retained by the client to ensure the contractor properly completes the construction works. Retention clauses may also be imposed on subcontractors.
However, retentions can cause cash flow problems for contractors and subcontractors, and this can be exacerbated by non-payment or late payment.
For more information, see The problems with retention.
On 26 April 2017, Alan Brown MP introduced the Construction Industry (Protection of Cash Retentions) Bill, to prevent this, but it did not progress because of the general election.
In October 2017, the government published the Pye Tait review; Retentions in the Construction Industry, which assessed the costs and benefits of retentions and alternative mechanisms. This was followed by a consultation on 'the practice of cash retention under construction contracts'.
The Construction (Retention Deposit Schemes) Bill 2017-19 proposes making provision for ‘…protecting retention deposits in connection with construction contracts; and for connected purposes’. It would do this by ensuring that retentions are held in a third party trust scheme.
During the first reading of the Bill, Peter Aldous said; “This Bill is relatively straightforward. It would amend the Construction Act to require the Secretary of State to introduce regulations to protect retentions. It would bring closure to the many efforts made in the past to address the problem. In doing so, it would transform the prospects of SMEs, which make up 99% of firms in the UK construction industry.”
The Bill passed its first reading.
[edit] Updates
On 12 March 2018, 60 industry bodies gave their support to the Bill, coordinated by the Building Engineering Services Association (BESA) and the Electrical Contractors Association (ECA).
ECA director of business Paul Reeve said; “Quite simply, the time for major change to retentions is now. Putting retentions in trust would help to protect the supply chain from future upstream insolvency, and it would reduce the amount held in retentions when buyers see that they can no longer use suppliers’ cash to support their own business model.”
However, on 14 March 2018, it was reported that the British Property Federation (BPF) - who had appeared on the list, did not in fact support the Bill. Ian Fletcher, director of real estate policy later clarified; "Our concern with the bill is that reforms must look at a broader range of issues that cover payment, risk and performance obligations throughout the whole supply chain and these are not likely to be covered and fully considered in a 10-minute rule bill."
By April 2018, more than 100 MPs (around 1 in 6 of all MPs) had expressed their support for the 'Aldous Bill', including the Green co-leader Caroline Lucas, the shadow Chancellor John McDonnell, the Conservative MP Ken Clarke, and the Liberal Democrat leader Vince Cable.
On 23 April, a petition supporting the Bill was delivered to 10 Downing Street. (Ref. http://www.constructionmanagermagazine.com/news/petition-demanding-payment-reform-presented-number/)
The Bill can be seen at: https://services.parliament.uk/Bills/2017-19/constructionretentiondepositschemes/documents.html
It proposes amending the Housing Grants, Construction and Regeneration Act 1996 such that any clause in a construction contract which enables a payer to withhold cash retentions shall be of no effect unless the monies are deposited in a retention deposit scheme.
The Bill was originally scheduled for its second reading on 27 April 2018, but this was postponed until 15 June 2018. Rudi Klein, chief executive of the Specialist Engineering Contractor’s Group, one of the organisation’s that helped develop the bill, said the delay gave time for government to consider its position. Other backers have indicated that the focus remains on expanding support and momentum within the industry, parliament and the wider public.
By the end of May 2018, it was reported that the Association of Accounting Technicians (AAT), had become the 80th body supporting the bill, joining a coalition of more than 550,000 companies and self-employed professionals.
In June 2017, the second reading of the Bill was pushed back again to 26 October 2018.
[edit] Related articles on Designing Buildings Wiki
- Campaign for cash retentions reform.
- Certificate of making good defects.
- Construction Act.
- Construction supply chain payment charter.
- Defects liability period.
- Final account.
- Interim certificate.
- Practical completion.
- Retention.
- Retention bond.
- Retention held in trust fund.
- Right to payment.
- The problems with retention.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.