When to install a staircase during the construction process
Installing a staircase too early in a build process exposes it to the risk of damage. Particularly with high-end staircases, from sweeping helical stairs to spiral staircases made with exposed solid hardwood, installing a stair in an ongoing building environment increases the risk of damage due to builders and tradesmen frequently using it.
With anything bespoke or custom made, ordering a staircase comfortably ahead of schedule is the best course of action. Leaving it too late can cause pressure and undue stress which could lead to mistakes in measuring, drawing or production.
The measurements must be complete, accounting for any floor finishes, architraves, radiators window sills etc. These dimensions need to be taken as late as possible to allow for one final draft of drawings before production. The earlier the site measurements are taken, the further they will be from the finished build.
Generally, it is better for a staircase to be one of the last items to be installed – perhaps a few days before the property is occupied. The walls should be plastered and painted and the finished floors laid – certainly downstairs.
Some builders like the staircase fitted halfway through the build, but this is mainly so they do not have to use ladders. They are probably also more familiar with conventional timber staircases which will later be carpeted. Simply protecting the treads will not be sufficient. A visibly protected stair might actually encourage people to use it and cause damage.
Communication and planning is the key to any successful project. Keep in mind that the original date for the stair install might well shift due to other delays with the build, so be prepared to alter it accordingly and keep the staircase company informed.
[edit] Related articles on Designing Buildings Wiki
- Stairs.
- Approved Document K.
- Maximum length of a flight of stairs.
- Protected stair v escape stair.
- Approved Document B.
- Protected stairway.
- Landings in buildings.
- Stairs riser.
- Means of escape.
- Types of stairs.
- Width of doors stairs and escape routes.
- Spiral stairs and helical stairs.
- Approved Document M.
- Stairs going.
- Stairs tread.
- Railings.
- Accommodation stair.
- Stairs nosing.
- Guarding.
Featured articles and news
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.