Underground obstructions
A number of different underground obstructions can be encountered during construction works that can cause significant delays and create safety hazards:
- Underground utility lines, including water, gas, electricity, sewage and telecommunication lines, are often located beneath construction sites. These lines can sometimes be identified using utility maps and records, but their locations may not always be accurately marked or recorded.
- Large rocks and boulders can be present in the soil and can create difficulties for excavation and construction work. They can also pose a hazard if not properly removed, as they can destabilise foundations.
- Underground structures, such as old foundations, vaults, and storage tanks, can be encountered during construction work. These structures may not be visible from the surface and can pose a significant risk to workers and equipment if not identified and managed correctly.
- Construction sites are often located in areas that have historical significance, and excavation work can uncover archaeological finds. These discoveries need to be managed carefully and properly documented, and may need to be reported, which can cause delays.
- Contaminated soil from previous industrial or agricultural activities can be present in the ground and may pose a risk to workers and the environment. This contamination can be difficult and expensive to remediate and can cause delays.
- Large trees can have extensive root systems that can be difficult to remove. These roots can also cause damage to underground pipes and cables and create instability in the soil.
- In areas with a history of mining, abandoned mine shafts and tunnels can be present in the ground. These can be difficult to locate and can pose a significant risk to construction workers if not identified and managed properly.
- Abandoned wells can be deep and difficult to locate, and if not properly filled and sealed, they can pose a risk of injury or contamination.
- In areas that have experienced military activity, unexploded ordnance (UXO) can be present in the ground. UXO can be extremely dangerous if accidentally detonated during construction work and must be identified and disposed of by trained professionals.
- In some areas, bedrock can be found close to the surface, making excavation and construction work more difficult and expensive.
- In areas that have been used for industrial activities, hazardous waste may have been disposed of in the ground. This can be difficult and expensive to remediate and can also pose health and environmental risks.
It is important that the necessary precautions are taken to identify and manage these underground obstructions before beginning excavation and construction work. This includes using appropriate surveying and ground investigation techniques to identify underground obstructions, and consulting with experts such as geologists, archaeologists and environmental consultants to assess and mitigate potential risks.
[edit] Related articles on Designing Buildings
- Archaeology.
- Brownfield site.
- Contaminated land.
- Earthworks.
- Excavation.
- Geophysical survey.
- Geotechnical engineering.
- Ground conditions.
- Ground investigation.
- Insitu testing of soils.
- Pre construction information.
- Site appraisal.
- Site information.
- Site investigation.
- Site surveys.
- Soil report.
- Soil survey.
- Walkover survey.
Featured articles and news
One of the most impressive Victorian architects. Book review.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.