Transit Elevated Bus (TEB)
Contents |
[edit] Concept
In August 2016, a futuristic public transport solution, the Transit Elevated Bus (TEB), began being tested in Qinhuangdao, China.
Chinese company Shenzhen Huashi Future Parking Equipment proposed the innovative design as a way of addressing the problem of congestion caused by rapid urbanisation and population growth of many of China's cities.
The TEB is a bus that straddles traffic by driving over the top of it, running along fixed tracks. Its main compartment is elevated, leaving the street clear for cars underneath. The design also incorporates solar panels on the roof and at bus stops to partially power the vehicle.
The vehicles could be capable of holding up to 1,200 passengers each and travel at 40 m/h (60 km/h). Designers estimate that the vehicles could reduce traffic congestion on main roads by 25-30%. They also highlight the relative affordability of the system - the construction cost of one TEB and 25 miles of route facilities is estimated at around $7.4 m, one-tenth the cost of building the same length of subway line.
Youzhou Song, the vehicle’s designer said: “The straddling bus could replace up to 40 conventional buses, potentially saving the 860 tons of fuel that 40 buses would consume annually, and preventing 2,640 tons of carbon emissions.”
[edit] Prototype
When the designs were first proposed many around the world greeted them with scepticism, however, testing on a prototype began in August 2016. The bus measures 22 m in length x 7.8 m wide (72 ft x 25 ft),
The testing is taking place on 300 metre-long test track, evaluating the braking system, drag and power consumption. Once complete, it will progress on to further testing stages.
But the TEB isn’t ready to deal with competing traffic just yet. For now, the TEB is limited to a 300 meter long test track that will evaluate the braking system, drag and power consumption. Once complete, the straddling bus will move on to further testing stages.
Despite being an unproven solution, countries such as Brazil, France and India have expressed their interest in introducing TEBs of their own.
[edit] Updates
In June 2017, the Chinese press reported that the idea of TEB as a mass-transport system had been abandoned.
Having had a prototype developed, reports suggest that those who tested it were left underwhelmed, with some saying that it ran too slowly and became overheated.
Other issues that have been cited for the scrapping of the elevated bus include the way it interacts with other vehicles, particularly those fitted with roof-racks, and other features of the city environment, such as low bridges.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.























