Falsework
Falsework is '...scaffolding or other temporary structures used to support construction components until the construction is sufficiently advanced to allow the structure to support itself'. Ref The HS2 London-West Midlands Environmental Statement, Department for Transport, November 2013.
There are three main types of systems used for falsework. These include:
- Type 1 - Aluminium support legs with aluminium frames assembled into falsework systems, such as; Ischebeck Titan, SGB GASS or PERI MultiProp.
- Type 2 - Individual aluminium or steel props, including either timber header beams or proprietary panels, such as ; PERI Multiflex or Doka Eurex Systems.
- Type 3 - Heavier steel falsework, such as; RMD Kwikform System Shoring or A-Plant Acrow Props.
The design philosophy behind falsework differs from that of permanent works. They are highly stressed, usually to 90% of their capacity over short periods of time and involve reusable components. Props are rarely tied down and rely on their self-weight and supported load for lateral stability.
The design of the falsework must make allowances for erection tolerances and take into account that the components are re-used many times.
Falsework capacities are provided by the manufactures and permanent, imposed and environmental loads must all be taken account of in their design.
As with general construction, stability is often identified as the main cause of collapse. BS 5975 (BSI, 2011; clause [IP address hidden]) recommends that all falsework is designed for 2.5% of the vertical load acting horizontally as a tolerance for workmanship during erection.
Workmanship and inspections play key roles in the design and installation of falsework, as attention to detail is particularly important.
NB BS 5975: Code of practice for temporary works procedures and the permissible stress design of falsework, was revised in 2019. It provides guidelines for the design, specification, construction and removal of falsework.
Ant Burd, BSI head of built environment, said: “This is a significant revision of an important standard that seeks to reflect changes in working practices and health & safety regulation within temporary construction and falsework. It offers procedural guidance to all organizations and personnel involved, to ensure competence in construction projects, from Principal Contractors and clients through to designers and trainers. The standard gives clear instructions and guidance to help companies be properly prepared for site investigations and compliant with current regulation.”
Ref https://shop.bsigroup.com/ProductDetail?pid=000000000030349708
[edit] Related articles on Designing Buildings Wiki
- Bridge construction.
- CDM.
- Crane supports.
- Deleterious materials.
- Designers.
- Design liability.
- Demolition.
- Facade retention.
- Formwork.
- Health and Safety.
- Scaffolding.
- Shoring.
- Slip form.
- Temporary works.
- Trench box.
- Trench support.
[edit] External references
- BS5975:2008 + A1: 2001 Code of Practice for Temporary Works Procedures and the Permissible Stress Design of Falsework (BSI 2011).
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.