Main author
Michael BrooksCube Houses
See the Unusual building design of the week series here.
The Cube (or Cubic) Houses are a series of unusual house design located in Rotterdam, Netherlands. They were conceived and constructed in the 1970s by architect Piet Blom as a response to the request from town planners for housing to be built on top of a pedestrian bridge. Blom had already built similar houses in the town of Helmand and so chose to repeat the design in Rotterdam.
Blom intended that the triangular peak of each of house would represent the top of a tree, with the asymmetrical design of the 40 cubic houses connected together representing an abstract forest.
The cubes comprise concrete floors and pillars and wooden framing, and sit tilted on a hexagonal base. The interior of the houses are divided into three levels accessed by a narrow staircase.
The walls and windows are angled at 54.7 degrees which provides good views of the surrounding area. However, the houses have been criticised for their lack of available space as, despite a total area of 100 sq. m, the angled structure means that only 25 sq. m is actually usable.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Building of the week series.
- Cabin Straumsnes, Norway
- Calakmul Corporate Building, Mexico.
- Dunmore Pineapple.
- Fallingwater.
- Futuro House.
- Gentle Genius.
- Habitat 67.
- House in the Orchard.
- Loyly, Finland.
- Ministry of Transportation Building, Georgia.
- Nakagin Capsule Tower.
- Unusual building design of the week.
- Upside Down House, Poland.
- Waldspirale.
- Wikkelhouse.
- Y House.
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.