Sky bridge
In February 2017, Preliminary Research Office was commissioned by a leading Chinese commercial drone company to design a pedestrian bridge between two towers which will become their headquarters in Shenzhen.
The body of the bridge is generated by the intersection of a set of conic volumes positioned along their common axis between the cores of the two towers.
At two points along this axis, perpendicular cones are introduced and split by the same primitive cones that generated the volume of the bridge. These perpendicular cones extend beyond the body of the bridge to create large platforms from which drones can be flown and observed, and which serve as meeting areas with expansive views of the surrounding city.
Adjacent to each platform, the bridge 'plugs in' to two enclosed structures that allow for additional circulation back to the towers. The two structures allow both vertical and horizontal circulation, and are attached to the exterior of the towers.
The bridge is split into two levels, meeting the first tower at the 28th floor and the second tower between floors 28th and 29th, with a staircase connecting both floors to the body of the bridge. The two levels within the bridge are connected by a large ramp that spans the two viewing platforms. Views into each partially-enclosed platform are generated by the level shift, and are visible when traversing the ramp.
Images and content courtesy of PRO.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
























