Rainwater downpipe
A rainwater downpipe is a pipe that is used to direct rainwater away from a building, typically from roof guttering to a drainage system. It is sometimes also referred to as a downspout, drain spout, roof drain pipe or leader.
The Building Regulation’s part H, Drainage and water disposal, requires that adequate provision is made for rainwater to be carried from the roof of buildings. Approved document H suggests that to achieve this, roofs should be designed with a suitable fall towards either a surface water collection channel or gutter that surface water to vertical rainwater downpipes, which in turn connect the discharge to the drainage system.
A downpipe is typically vertical and extends to ground level. They are most commonly found attached to the corners of a building. The discharge from a downpipe can be:
- Directly connected to a drain discharging into a soakaway.
- Directly connected to a drain discharging into a surface water sewer.
- Indirectly connected to a drain via a trapped gully if the drain discharges into a combined sewer.
Traditionally, rainwater downpipes were made using cast iron, although uPVC systems are increasingly common due to ease of installation and low maintenance requirements. As long as adequate size, strength and durability can be assured, they can also be made of aluminium alloy, galvanised steel, stainless steel, and so on.
Downpipes have a tendency to become blocked when debris such as leaves and twigs accumulate. To prevent this, they should be properly maintained, and are usually attached to a building using brackets which can be easily removed for cleaning if necessary.
The size and number of rainwater downpipes required will depend on the intensity of rainfall that is likely and the area of the surface to be drained. A number of online calculators are available to help determine the required size and number of rainwater downpipes.
Rainwater downpipes are most commonly round in section, but may be any shape. They typically have a diameter ranging from 50 - 150 mm, but any size can be used. They may include access panels for inspection or rodding, branch connectors, bends, hoppers and leaf guards at the top, diverters, rainwater harvesting systems, angled shoes at the bottom, and so on.
[edit] Related articles on Designing Buildings Wiki
- All eyes up to plastic rainwater systems.
- Approved Document H.
- Correct way to fix lead guttering.
- Culvert.
- Drainage.
- Drainage stack.
- Drains.
- Groundwater control in urban areas.
- Rainwater.
- Rainwater goods.
- Rain gutter.
- Rainwater harvesting.
- Rainwater head.
- Safe working in drains and sewers.
- Sanitary pipework.
- Sewer construction.
- Soakaway.
- Soil vent pipe.
Featured articles and news
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.