Schedule
In its broadest sense, the term ‘schedule’ simply refers to a list. That can be a list of items, activities, events, information and so on. Sometimes schedules will also include dates, such as the dates on which activities listed in the schedule will be carried out (in the construction industry this is more commonly referred to as a programme). Schedules may be appended to other documents, such as contracts.
A project schedule is a graphic presentation of all activities in a project required to produce the output. Gantt Charts, Network Diagrams, CPM and PERT techniques can be used to create the project schedules.
As construction projects and completed buildings are complicated, they take considerable organisation and can involve a number of different types of schedule. Articles on Designing Buildings Wiki about some of the more commonly used schedules include:
- Activity schedule.
- Call-off schedule.
- Contractor's working schedule.
- Information release schedule.
- Information request schedule.
- Payment schedule.
- Schedule of condition.
- Schedule of accommodation.
- Schedule of defects.
- Schedule of dilapidations.
- Schedule of drawings.
- Schedule of rates.
- Schedule of services.
- Schedule of tender adjustments.
- Schedule of work.
- Scott schedule.
- Window and door schedules
See also: Programme.
Featured articles and news
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.





















Comments