Line of junction notice
A line of junction, is an imaginary line that separates the land of adjoining owners.
Section 1 of the Party Wall etc. Act applies where lands of different owners adjoin and:
- are not built on at the line of junction; or
- are built on at the line of junction only to the extent of a boundary wall (not being a party fence wall or the external wall of a building),
and either owner wishes to build on any part of the line of junction.
The notice must be served by the party wishing to build the wall, at least one month before they intend the building work to start, giving a description of the proposed works.
Having been served with the notice, the adjoining owner must serve a notice indicating their consent. This stipulates that the wall should be built on half of the land of each owner or in another position that they may agree on, and that the expense of the wall shall be split between them depending on the use that has been, or is to be, made by them.
If the adjoining owner does not consent, then the building owner is only able to build the wall at their own expense and it must be entirely on their land. They may still, within 12 months, place below the level of the land of the adjoining owner projecting footings and foundations necessary for the construction of the wall. They must compensate any adjoining owner and any adjoining occupier for any damage to their property.
A template line of junction notice is as follows:
|
To: (Adjoining Owner) of: [Address] I/We (Building Owner) of: [Address] as owner(s) of the land and premises known as: [name and number] which adjoins your premises known as: [name and number] I/we hereby serve NOTICE on you Under Section 1 (2), subject to your written consent it is intended to build on the line of junction of the said lands a *party wall/party fence wall. Under Section 1 (5) it is intended to build on the line of junction of the said lands a wall wholly on *my/our own land. Under Section 1 (6) it is intended to place projecting footings and foundation on your land at *my/our expense. The accompanying drawings show the proposed works which are: [details of the works] I/we propose to commence the works after the expiration of one month from the date of this notice or earlier if you agree. In the event of a dispute arising for settlement *I/we would appoint as *my/our surveyor: [name and details of surveyor] Signed Date |
[edit] Related articles on Designing Buildings
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Guide to ISO 19650 for Architecture Firms (2026)
A user gives their low down.
A UK training and membership provider for mould remediation professionals.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
Independent NSI and BAFE study exploring how organisations are changing the way they buy fire safety services.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.

















