Line of junction notice
A line of junction, is an imaginary line that separates the land of adjoining owners.
Section 1 of the Party Wall etc. Act applies where lands of different owners adjoin and:
- are not built on at the line of junction; or
- are built on at the line of junction only to the extent of a boundary wall (not being a party fence wall or the external wall of a building),
and either owner wishes to build on any part of the line of junction.
The notice must be served by the party wishing to build the wall, at least one month before they intend the building work to start, giving a description of the proposed works.
Having been served with the notice, the adjoining owner must serve a notice indicating their consent. This stipulates that the wall should be built on half of the land of each owner or in another position that they may agree on, and that the expense of the wall shall be split between them depending on the use that has been, or is to be, made by them.
If the adjoining owner does not consent, then the building owner is only able to build the wall at their own expense and it must be entirely on their land. They may still, within 12 months, place below the level of the land of the adjoining owner projecting footings and foundations necessary for the construction of the wall. They must compensate any adjoining owner and any adjoining occupier for any damage to their property.
A template line of junction notice is as follows:
|
To: (Adjoining Owner) of: [Address] I/We (Building Owner) of: [Address] as owner(s) of the land and premises known as: [name and number] which adjoins your premises known as: [name and number] I/we hereby serve NOTICE on you Under Section 1 (2), subject to your written consent it is intended to build on the line of junction of the said lands a *party wall/party fence wall. Under Section 1 (5) it is intended to build on the line of junction of the said lands a wall wholly on *my/our own land. Under Section 1 (6) it is intended to place projecting footings and foundation on your land at *my/our expense. The accompanying drawings show the proposed works which are: [details of the works] I/we propose to commence the works after the expiration of one month from the date of this notice or earlier if you agree. In the event of a dispute arising for settlement *I/we would appoint as *my/our surveyor: [name and details of surveyor] Signed Date |
[edit] Related articles on Designing Buildings
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.