Heads of terms
"Heads of Terms" refers to a non-binding document outlining the key terms and conditions agreed upon by parties before the finalisation of a formal contract. It serves as a preliminary agreement that sets the framework for further negotiations and drafting of the detailed contract.
It summarises the principal points of the agreement between the parties,and establishes a basis for detailed negotiations and drafting of the formal contract, ensuring that both parties are on the same page regarding the key aspects. This helps to focus discussions on important issues and prevents misunderstandings or disputes later in the process.
It might include terms such as:
- The scope of work.
- Project timelines.
- Payment terms and conditions.
- Roles and responsibilities of the parties involved.
- Confidentiality provisions.
- Any conditions precedent (conditions that must be met before the agreement becomes effective)
- Procurement and contract strategy. This should include carefully thought out risk allocation (procurement routes might involve bills of quantities, schedules of activities, target cost formulae and part design responsibility).
- Choice of contract.
- Conditions of engagement for consultants.
- Design and collateral warranties.
- Incentive mechanisms.
- Abortive terms.
While Heads of Terms indicate a mutual intent to proceed, they are generally not legally binding except for certain clauses, such as confidentiality and exclusivity, which might be explicitly stated as binding.Heads of Terms can be particularly useful in complex construction projects where multiple parties are involved, helping to streamline the process and set clear expectations before committing to a detailed and binding contract.
[edit] Related articles on Designing Buildings
Featured articles and news
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.