Equipment installed in buildings
The article relates to equipment installed in buildings. For equipment used in construction works, see: Equipment used to construct buildings.
It is important to identify equipment that will be provided within the main contract and equipment which, whilst it may be provided outside of the main contract (because the client may already have the equipment, or they may have existing suppliers) might have an impact on the main contract (perhaps needing to be accommodated in a certain location, or requiring fixing, power supply, air supply, water, drainage, telecommunications connection, etc.).
Equipment requirements might include:
- Built in equipment requiring mechanical or electrical connections such as fume cupboards or drinks stations. A description of built in equipment should include; location, size, and requirements for power, air, water, drainage and telecommunications connection.
- Built in equipment that does not require services such as cupboards or shelving. These should be described in terms of their location and size.
- Stand alone loose furniture and equipment requiring services, such as washing machines, coffee machines and scanning equipment in hospitals. These should be described in terms of their location, size, and requirements for power, air, water, drainage and telecommunications connection.
- Stand alone loose furniture and equipment not requiring services such as tables and chairs. These should be described in terms of their location and size.
[edit] Related articles on Designing Buildings Wiki
- Chattels.
- Commissioning.
- Compressed air plant.
- Concreting plant.
- Construction plant.
- Construction tools.
- Crane regulations.
- Debris netting.
- Earth-moving plant.
- Excavating plant.
- Fittings.
- Fixtures.
- Industrial plant and construction operations.
- Packaging.
- Plant room.
- Power float.
- Procurement route.
- Room data sheet.
- Sanitaryware.
- Specification.
- Tender.
- Tender documents.
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.