Electricity bill
An electricity bill, in the context of buildings and their owners and/or occupants, is effectively an invoice detailing money that is owed for electrical energy that has been used.
In its simplest form, electrical energy will have been metered, usually in terms of the quantity of kilowatt hours that have a been used in a given time period.
A kilowatt hour or ‘Kwh’ is the quantity of energy that a load of 1Kw uses in 1 hour.
So:
1Kw running for 1 hour = 1Kwh
Equally:
0.5 Kw (500w) running for 2 hours = 1Kwh
And
2kW running for 30 minutes also = 1Kwh
1Kwh is also known as ‘1 unit of electricity’
The company supplying the energy will have set the price for the unit of electricity. This and other details that make up the bill will be detailed in the supplier’s terms and conditions. Such terms and conditions are known as tariffs.
Tariffs will vary widely between suppliers. As well as detailing the cost per unit of electricity, these will also cover other costs that make up the total amount owed.
In its most simple form, the bill will set out payment terms, such as payment due date, VAT rate if applicable and methods by which payment may be made.
On larger installations, it is common to see much more detailed tariffs, which may often encourage electricity saving at peak times and variable unit rates for different times of day.
With more complex tariffs, electricity usage will be charged while taking into account other factors such as:
- Time of day.
- Maximum demand at any given point in time.
- Seasonal variations.
- Power factor that electricity has been taken at.
- System usage charges.
- Payment methods.
The electricity bill must clearly set out all this information so that it is easy to establish how the total amount charged has been calculated.
NB Making Mission Possible - Delivering A Net-Zero Economy, published by the Energy Transitions Commission (ETC) in September 2020, suggests that the levelised cost of electricity (LCOE) is: ‘A measure of the average net present cost of electricity generation for a generating plant over its lifetime. The LCOE is calculated as the ratio between all the discounted costs over the lifetime of an electricity-generating plant divided by a discounted sum of the actual energy amounts delivered.’
--ECA
[edit] Related articles on Designing Buildings
- Articles about electricity.
- Consumer electronics.
- Consumer unit.
- ECA calls on Government to reform and rebalance energy levies and avoid cost of living crisis.
- Electrical appliance.
- Electrical consumption.
- Electrical energy.
- Electrical equipment.
- Electrical installation.
- Electrical power.
- Electrical safety.
- Energy cost.
- Energy price crisis: ECA calls for energy levy reform.
- Energy tariffs.
Featured articles and news
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.