Dwelling emission rate DER
The Building Regulations set out requirements for specific aspects of building design and construction. Regulation 26 of the building regulations states that “Where a building is erected, it shall not exceed the target CO2 emission rate for the building…”,
The target CO2 emission rate (TER) sets a minimum allowable standard for the energy performance of a building and is defined by the annual CO2 emissions of a notional building of the same size and shape to the proposed building. TER is expressed in annual kg of CO2 per m2.
The Dwelling emission rate (DER) is the actual CO2 emission rate of self-contained dwellings and individual flats (excluding common areas) based on their actual specification.
The DER for the proposed building must not exceed the TER.
Before construction begins, a design stage calculation must be issued to the Building Control Body (BCB), setting out the TER, and DER for the proposed building, along with details of its proposed specification.
Within 5 days of the completion of the construction, a report must be issued to the Building Control Body (BCB), setting out the TER, and DER of the completed building, along with any changes that have been made to the specification, and an energy performance certificate (EPC). These ‘as-built’ calculations require that an air-permeability test is carried out to ensure that the building envelope has been constructed to a suitably high level of workmanship so that air (and with it, heat) will not ‘leak’ through the building fabric. In addition, the BCB is likely to require a commissioning notice.
The TER and DER can be calculated by following the Standard Assessment Procedure (SAP). This can be done by using a computer program approved for SAP calculations by BRE on behalf of the government.
NB 2013 changes to part L of the building regulations which came into force on 6 April 2014 introduced a Target Fabric Energy Efficiency (TFEE) rate for dwellings to sit alongside the Target Emission Rate. The TFEE is the minimum energy performance requirement for a new dwelling. The Dwelling Fabric Energy Efficiency (DFEE) rate is the actual energy performance of the new dwelling. The DFEE must not exceed the TFEE. See Target fabric energy efficiency rate for more information.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Air permeability testing.
- Approved documents.
- Building emission rate.
- Building regulations.
- Dwelling type.
- Improving the energy efficiency of buildings.
- National Calculation Method.
- Simplified Building Energy Model.
- Standard Assessment Procedure.
- Target emission rate.
- Target fabric energy efficiency rate.
[edit] External references
- Planning portal: Approved document L.
Featured articles and news
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.
Put digitalisation and sustainability at the core of curricula
Project management educators are urged.
Looking back at the influence of climate events
From a designer and writer: 'There are limits to growth but no limits to development'.
Terms, histories, theories and practice.
Biophilic design and natural light
Letting in the light and natural elements into spaces.
APM Programme Management Conference 2024
Strategies for Success.
Residential takes the reins as contract awards even out
Contracts down, but remain above the last quarter of 2023.
Celebrating Eid and the largest mud-brick building.
Barry Kingscote claims prestigious CIOB CMYA Award.
The British Mosque: an architectural and social history
The story of some 1,500 mosques or more in Britain.
Heat pump refrigerants, efficiencies and impacts
R12 to R1270 what are the differences?
Global heat pump market in 2023
Challenging times with positive but modest outlook.
Beyond the infrastructure pipeline
Opportunities and chokepoints.