Disturbing complacency over short courses
|
What has emerged from the discussions, investigations and reports following the tragic Grenfell Tower disaster in 2017 is that a disturbingly complacent approach to competence lies at the heart of many of the problems that led to the fire.
ECA has warned government and industry against a counterproductive trend towards short, classroom-based courses, which claim to prepare budding tradespeople for electrical and other installation work. These courses do not provide the technical understanding, or the extended real-life, on-the-job experience needed to ensure safe electrical work.
However, within the electrotechnical industry, many individuals are claiming to be competent electricians despite having trained, in some cases, for only a matter of weeks.
The publication in August 2019 of the ‘Raising the Bar’ recommendations underline the urgency and importance of ensuring that everyone who works in and on buildings must be sufficiently competent.
We should all remember we are talking about protecting people’s lives. To be blunt, It is time to stop messing around with low levels of electrical and fire safety competence, and in particular it is high time to say a final goodbye to the so-called ‘five-week wonders’ – wrongly deemed by some as competent to design and install electrical work.
ECA has mapped a way forward in its response to ‘Raising the Bar’. ECA and the wider industry need to stop settling for low levels of competence, which put buildings, and hence lives, at risk.
In the months following the Grenfell fire, former Chair of the Health and Safety Executive Dame Judith Hackitt was tasked with undertaking an independent review of building regulations and fire safety to address the flaws in the system which allowed the disaster to happen.
ECA and the Fire and Security Association (FSA) made a number of influential representations to the review, having listened closely to industry concerns over competence and fire safety.
In early 2019, ECA welcomed the government’s confirmation that a new regulatory system would come into place, supported by stronger sanctions and enforcement powers.
As 2019 draws to a close, and with phase two of the Grenfell inquiry report underway, ECA and the FSA will continue to offer advice and informed opinion wherever possible, to ensure such a tragedy can never happen again.
[edit] About this article
This article was written by Andrew Eldred, ECA Director of Employment and Skills. It previously appeared on the website of the Electrical Contractors' Association (ECA) in November 2019 and can be accessed HERE.
More articles by ECA on Designing Buildings Wiki can be accessed HERE.
[edit] Related articles on Designing Buildings Wiki
- Approved document B.
- BRE articles on Designing Buildings Wiki
- BS 9999.
- CE marking
- Fire detection and alarm system.
- Fire detector.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135).
- Fire protection engineering.
- Fire safety design.
- Fire safety officer.
- Fire.
- Ionisation smoke alarm.
- Joint fire code.
- Managing fire risk in commercial buildings: A guide for facilities managers.
- Optical smoke alarm.
- Smoke detector.
- The causes of false fire alarms in buildings.
- Understanding the factors affecting flashover of a fire in modern buildings.
--ECA
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.