Construction covered by the Party Wall Act of 1996
Contents |
[edit] Introduction
When discussing works that fall within the remit of the Party Wall Act of 1996, it is important to understand and differentiate between works that are ‘notifiable’ and works that are not covered within the Act, also known as “non-notifiable” works.
The term notifiable referrers to works that may be taking place within a homeowner’s property (or building owner under the Party Wall Act 1996). If the proposed works affect any of the neighbouring properties (known as the adjoining owner’s property), then Party Wall procedures will apply.
Notifiable works usually fall within different categories and are notifiable under different Sections of the Act. Notifiable works usually include:
- Excavations taking place near an adjoining owner’s property (such as walls, outhouses or garden structures).
- Works taking place which directly affect a party structure or party wall.
- New walls being built up to - or astride - the line of junction (or boundary line) between two or more properties.
[edit] Excavations
Excavation works taking place within a building owner’s land may still be notifiable, since it may pose a risk to the foundations beneath those structures. This often comes into play with rear extensions or basement conversions.
The sections of the Party Wall Act of 1996 that would apply are:
- 6(1) Excavate to accommodate the foundations to a proposed extension within three metres.
- 6(2) Excavate to accommodate the foundations to a proposed extension within six metres where it cuts at a 45 degree angle measured from the adjoining owner’s footing
[edit] Works directly affecting party wall or structure
Works that directly affect a party structure or party wall have a two month notice period. These types of works most commonly tend occur when undertaking loft conversions, removing chimney breasts or undergoing other structural works to the party wall.
Under the Act, the different types of work covered are set out within the sections below:
- 2(2)(a) To underpin, thicken or raise a party structure, a party fence wall, or an external wall which belongs to the building owner and is built against a party structure or party fence wall.
- 2(2)(b) To make good, repair, or demolish and rebuild, a party structure or party fence wall in a case where such work is necessary on account of defect or want of repair of the structure or wall.
- 2(2)(f) To cut into the party wall for the insertion of steel beams facilitating a proposed loft conversion in the process exposing the party wall.
- 2(2)(g) To cut away the chimney breast(s) attached to the party wall.
- 2(2)(h) To cut away parts of any wall or building of an adjoining owner overhanging onto the land of the building owner.
- 2(2)(j) To cut into the wall of an adjoining owner’s building in order to insert a flashing or other weather-proofing.
- 2(2)(k) To execute any other necessary works incidental to the connection of a party structure.
- 2(2)(l) To demolish party fence wall and rebuild as a party wall.
- 2(2)(n) To expose the party wall.
[edit] New walls
In order to build a new wall up to - or astride - the boundary line, a building owner must get consent beforehand. If the building owner does not get consent, then the new wall must be built within the building owner’s boundary and therefore be built up to the line of junction. These types of works are most commonly the flank walls of new rear, side or front extensions.
The section that would apply to this would be:
- 1(2) Build a new party wall astride the line of junction, forming the flank wall of the proposed extension.
- 1(5) Build a new wall up to the line of junction, but wholly on the building owner’s land forming the flank wall of the proposed extension.
This article was provided by Berrylodge in April 2020.
[edit] Related articles on Designing Buildings
Featured articles and news
ECA, JIB and JTL back Fabian Society call to invest in skills for a stronger built environment workforce.
Women's Contributions to the Built Environment.
Calls for the delayed Circular Economy Strategy
Over 50 leading businesses, trade associations and professional bodies, including CIAT, and UKGBC sign open letter.
The future workforce: culture change and skill
Under the spotlight at UK Construction Week London.
A landmark moment for postmodern heritage.
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.