Building products
Products are processed, finished items that are offered for sale. That is, they are manufactured combinations of materials and perhaps other products, processed to create items such as doors, windows, light fittings, and so on.
They are generally distinguished from ‘materials’ which are raw, unprocessed substances such as sand, salt, and so on, and from ‘services’ which are activities such as consultation, maintenance, installation, or sometimes the provision of accommodation.
See Products v goods v materials for more information.
The Construction Products Regulation defines a ‘construction product’ as; ‘…any product or kit which is produced and placed on the market for incorporation in a permanent manner in construction works or parts thereof and the performance of which has an effect on the performance of the construction works with respect to the basic requirements for construction works.'
BSI Flex 8670 V3.0, Built environment – Core criteria for building safety in competence frameworks – Code of practice, April 2021 Version 3, published by The British Standards Institution in 2021, defines a construction product as a: ‘…product, substance or collection thereof that has been manufactured, refined or processed and declared by its manufacturer for an intended end use for temporary and/or permanent inclusion in building or civil engineering works, refurbishment or maintenance.’
The Code for Construction Product Information, Version 1.0, published by CCPI in September 2021 defines a construction product as “a product, substance or collection thereof, that has been manufactured, refined or processed and declared by its Manufacturer for an intended end use for temporary and/or permanent inclusion in a building or civil engineering works, whether as part of new construction, refurbishment or maintenance.”
Redefining value, The manufacturing revolution, Remanufacturing, refurbishment, repair and direct reuse in the circular economy, published by the United Nations Environment Programme in 2018, suggests that the word product: ‘Refers to an article, object or substance that is manufactured or refined for sale, that is the final output of a process.’
PAS 9980:2022, Fire risk appraisal of external wall construction and cladding of existing blocks of flats – Code of practice, published by BSI Standards Limited in 2022, defines a product as: ‘a item that is formed of one or more materials… For example, painted aluminium or timber, ACM and manufactured boards which have a complex internal structure or densities which differ across their thickness, are all non-homogenous products. For the purpose of reaction to fire testing, only the surface material (such as paints/coatings, the aluminium sheet of ACM where this is not painted, or the portion of a product that is essentially the same as what is exposed at the surface) is deemed to be the surface. Some products are homogenous.’
For a list of all Designing Buildings articles about building products, click here.
[edit] Related articles on Designing Buildings
- Articles about products and services.
- Building activities definition.
- Building complex.
- Building component.
- Building element.
- Building entities.
- Building spaces definition.
- Building system.
- By-product.
- Co-product.
- Constituent construction product.
- Construction Products Regulation.
- Intermediate product.
- Manufacturer.
- Product manufacturers must regain confidence.
- Products v goods v materials.
- Sundry items.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.