A project is a series of related a tasks which when they are carried in the correct order will lead to the completion of the project. Projects will tend to run independently of the businesses involved in them and follow their own schedule. A programme is a series of interrelated projects that may be carried out repeatedly or continuously in order to support an ongoing process.they tend to be integral to the businesses carrying them.
[edit] The Code of Practice for Project Management for the Built Environment
The latest (sixth) edition of construction project management processes, set within the context of a number of key drivers in the industry, including the need for smart and sustainable solutions and increased value, innovation, safety and informationsharing.
The Code of Practice for Project Management for the Built Environment delivers an up-to-date and comprehensive reference to the principles and practice of project management in construction and development. This latest (6th) edition covers the new technologies, internationalisation, changing legislation, and productivity and profitability challenges faced by contractorsthat are driving significant change in the industry.
A thorough walk through of project inception, feasibility analysis, strategy, and the pre-construction process. Plus comprehensive explorations of the construction stage of projects, as well as testing and commissioning, and projectcompletion, handover, and operation.
This article appears on the CIOB Academy website as 'Code of Practice for Project Management for the Built Environment, 6th edition'.
[edit] Code of Practice for Programme Management in the Built Environment. Second edition
This second edition of the Code of Practice for Programme Management in the Built Environment is a natural developmentfrom the first edition and builds on the recently published 6th edition of the highly successful Code of Practice for Project Management for the Built Environment.
The sixth edition for Project Management continues to provide the relevant guidance and procedural requirements for the successful management of individual projects. This second edition of Programme Management further develops the elements of functionality and procedures specific to the management and successful delivery of a number of related projectswithin the built environment, focussed at the programme level on the coordinated creation of value, which presents itself as a trade-off in the relationship between:
- Benefits and outcomes (via outputs);
- Risks and opportunities;
- Requirements and objectives (incl. cost and time).
- Authored and supported by industry and government experts in the field.
This article appears on the CIOB Academy website as 'Code of Practice for Programme Management in the Built Environment. Second edition'.
--CIOB
[edit] Related articles on Designing Buildings
- CIOB articles,
- Code of Practice for Programme Management in the Built Environment. Second edition.
- Code of Practice for Project Management for the Built Environment, 6th edition.
- Design management.
- Portfolio v programme.
- Preliminary business case.
- Project execution plan.
- Project management.
- Risk management.
- Value management.
Featured articles and news
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.