BREEAM External lighting
Contents |
[edit] Aim and benefits
The aim of this credit is to encourage the installation of energy efficient lighting for external areas.
This issue offers the following potential benefits to end users and clients:
- Reduced energy costs due to higher efficiency lighting.
[edit] When to consider
RIBA Stages 3-4 (Developed Design-Technical Design)
[edit] Step by step guidance
- Request confirmation on whether there is external lighting present.
- If there is, provide the design team with the design criteria for compliance.
- Request evidence (see section below) to demonstrate compliance at the design and post construction stages.
[edit] Questions to ask while seeking compliance
- Does the building have external areas which require external lighting?
- Is the building an infill building on an existing site or an extension to an existing building?
- Will there be any areas with intermittent pedestrian traffic?
[edit] Tools and resources
External lighting - Top 10 easy win issue
https://kb.breeam.com/section/new-construction/uk/2014-uk/energy-breeam_uk_nc_2014/ene03/
[edit] Tips and best practice
- Double-check that the manufacturers’ product datasheets provide all the required information and match up to the specification provided on any drawings showing external lighting.
[edit] Typical evidence
[edit] Design Stage Evidence
A site plan indicating external lighting (both locations of light fittings and types), accompanied by manufacturers’ product datasheets for each external light fitting. A schedule of external lighting and calculations for the average lumens per circuit watt may also be provided.
[edit] Post Construction Stage Evidence
As Built issue of the external lighting plan, and confirmation of any changes to the external lighting specification since design stage.
Whilst on site, take photographs of the external light fittings, any PIR sensors and photocells/timeclocks as required.
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- BREEAM UK New Construction 2014
- BREEAM UK Refurbishment and Fit-out 2014
- BREEAM International New Construction 2016
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Tom Blois-Brooke 16:21, 01 Jul 2019 (BST)
--Elisa Caton 12:35, 06 Mar 2018 (BST)
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















