Wuhan Hospital, China
Images of a timelapse were spread all over social media and news outlets in February 2020 as China built a new hospital facility in around 2 weeks 'from scratch'. News outlets reported that the facility has around a 1,000-bed capacity and was designed, procured and built-in this timescale.
It is more likely that the hospital facility is part of a larger state-run emergency action plan which has been sitting designed on a shelf especially for such an event after the last SARs virus outbreak in China.
Regardless if the modular unit construction or design is included in the timescale, it is still an amazing feat to build such a scale of off-site modular building in such a short space of time, and questions are now being asked about why this is not being implemented across the construction industry. The concept is not new, and the Egan Report and Latham report both attempted to resolve issues with wastage in the construction industry.
Further studies will no doubt be carried out on the back of these buildings construction timescales to see what lessons can be learned to improve construction timescales globally.
[edit] Related articles on Designing Buildings Wiki
- Cancer Centre at Guy's Hospital
- Conserving Ruchill Hospital water tower
- Fountaine Hospital Almshouse
- How a Complex Hospital Building for Orthopaedic Services was Constructed in Less Than Four Months
- How to Develop the Most Constrained Hospital Sites to Reduce Waiting Times and Improve Patient Care
- Khoo Teck Puat Hospital
- North Middlesex University Hospital Maternity Unit
- Researching the history of Fountaine Hospital Almshouse
- Sea Sand Tower Hospital Queen Elizabeth, Kota Kinabalu, Malaysia
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.