In June 2017, America’s tallest building west of the Mississippi River opened in Los Angeles. At 335 m (1,099 ft), the supertall skyscraper claims the title courtesy of its spire, which beats the US Bank Tower by 24 m (80 ft).
The glass-clad 73-storey tower was designed by Los Angeles (LA) architects AC Martin and is located on the edge of the Downtown area, amidst a concentration of the other high rises.
It contains an 889-room hotel, restaurants, retail and office space, a rooftop swimming pool, and an open-air observation deck. The sail-like glass crown that tops the building is illuminated with programmable LEDs, which also continue down the spine of the building.
The project cost an estimated $1.2 billion. It is one of a number of large-scale skyscraper projects scheduled for construction in LA over the coming years, including schemes by BIG and Frank Gehry.
[Photo credit: Gary Leonard/Wilshire Grand Center]
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.