Water Supply (Water Fittings) Regulations 1999
The Water Supply (Water Fittings) Regulations 1999 make provisions for preventing contamination and waste of water supplied by a water undertaker. A water undertaker is a company that has statutory powers and duties to supply water and/or sewerage services to premises within a geographic area designated under the Water Industry Act 1991. These are the incumbent water companies and inset appointees.
Commonly referred to as the Water Fittings Regulations, these regulations were passed with the intention of stopping the waste, misuse, undue consumption and erroneous measurement of the drinking water supply. They do not apply to premises that do not have a public water supply connection.
The Water Fitting Regulations define requirements for the design, installation and maintenance of plumbing systems, water fittings and water using appliances in England and Wales. In Scotland, the equivalent provisions are covered in The Water Fittings Regulations (or Byelaws 2000).
[edit] Related articles on Designing Buildings
Featured articles and news
Myths and top tips.
CLC plans to ease impact of construction inflation.
BG 50 & VDI 2035 – your questions answered.
Types of domestic heating systems.
Will the way we heat homes change when winter comes ?
Extended reality in a post-pandemic world.
Can XR technology be leveraged in design & construction?
Or are you capping.
STEM ambassadors needed for ICE CityZen award.
Digital gaming competition for UK students aged 16 to 18.
Heritage protection in England vs Australia.
Fire doors and the Fire Door Inspection Scheme.
Three-quarters of fire doors fail inspections
UN International Day for Biological Diversity, May 22.
The role of geoparks, biospheres and world heritage sites.
BSRIA conference 2022, June 23.
Just one month to go ! Find out more here.
Restoring Broadbent’s Bath House
A new gallery for the University of Huddersfield.
Corruption in the construction industry.
What will it take to stop it ?
To celebrate world bee day 2022 !
Just one month until the changes to part L come into effect.
Not forgetting part F and the new part overheating part O.
Heat Pump demand rises by one quarter.
As energy prices jump up in cost.
With people in the UK from Ukraine.
Industry leader Steve Murray takes on role.
An abundant and versatile building material.
How overheating complicates ending gas in the UK.
600,000 heat pump installations targeted per year by 2028.
Cost planning, control and related articles on DB.
Helping prevent those unwanted outcomes.