Constructing steel buildings
Contents |
[edit] Introduction
The manufacture of a steel building is a combination of engineering, draftsmanship, ingenuity, teamwork, know-how and manufacturing expertise. Some factories fabricate all the required building components ensuring they are compatible.
[edit] Optimising the process
Pre-engineered steel buildings engineers review the building drawings for accuracy and to obtain permissions.
Actual building production begins with the input of building specifications into CNC (Computer Numerical Control) machinery. The CNC machinery controls all machine features including feeds and speeds.
Components of steel buildings, such as I-beams, gutters and downpipes, sidewalls and end wall panels, and even standing seam roofs are systematically manufactured in designated areas called "lines" throughout the factory. Each manufacturing line completes a specific function, automated by the use of conveyors that move the components from station to station.
[edit] Manufacturing components
The construction of rafters and columns starts at a machine that cuts the centre of the rafter or column (like the center of the letter "H"). This component moves to a holding station waiting to move to a station where certified welders tack-weld flanges and webs in place to form rafters and columns. Next these components are fused together and the welds are then checked.
Roof and sidewall panels are fabricated from steel sheeting. Large coils of metal sheeting are placed in a machine for straightening. This sheet is then cut and passed through a roll former to give it the required shape.
Machinery automates the process by which custom trim is formed. The steel passes through a straightener and is then formed into the shape required for all trim components: rake trim, corner trim, jamb trim, head trim, base trim, eave trim, rake angle, base angle, gutter straps, downpipes and gutters.
The steel building components are then loaded onto trucks to be delivered to site.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..