Tender price
A tender is a submission made by a prospective supplier (the ‘tenderer’) in response to an invitation to tender (ITT). It makes an offer for the supply of goods or services. A tender price is therefore the price supplied by the tenderer to the client for the supply of those goods or services.
The tender price is usually based on information about the project that has been supplied by the client in the ITT documents. These documents are usually as comprehensive as possible to allow the formulation of accurate tender prices and may include:
- A letter of invitation to tender.
- The form of tender.
- Preliminaries.
- The form of contract.
- A tender pricing document.
- A drawing schedule.
- Design drawings.
- Specifications.
If the client’s documents to not adequately describe the project they could lead to unrealistic tender submissions.
When suppliers submit their tender price, it will represent the price at which they have decided to do the works or supply the goods or services, along with proposals for how the client’s requirements will be satisfied - if these have been requested.
The tender price supplied will be presented in a way set out in the tender pricing document A tender pricing document sets out the way the client wishes to review the breakdown of overall tender prices provided by the tendering contractors.
Because the tender pricing document is designed to allow easy, like-for-like comparisons between the tender prices submitted by the various suppliers, it can reveal to the client where the best value for money lies among the tenderers, identifies significant differences as well as areas where savings can be made or negotiations undertaken.
[edit] Tender price indices
Tender price indices allow tenderers and clients to see how tender prices for building contracts are changing. The indices may be used in estimating, cost-checking and fee negotiation with reference to particular sectors e.g private housing, commercial work etc.
An example is the Tender Price Index of Public Sector Building Non-Housing (or PUBSEC) that is produced by the Building Cost Information Service (BCIS) on behalf of the Department of Business Innovation and Skills (now called the Department for Business, Energy and Industrial Strategy (BEIS).
PUBSEC is based on rates of measured work contained in Bills of Quantities or quantified schedules for accepted tenders. The index, published quarterly, is accurate as it is based only on projects where the procurement process has produced ‘measured work’ documents.
For more information see: Construction price and cost indices.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Auction theory.
- Best value.
- Common mistakes in construction tenders.
- Competitive tender.
- Construction contract.
- Construction price and cost indices.
- Due diligence when selecting contractors or subcontractors.
- Form of tender.
- How to prepare tender documents.
- Pre-tender Interviews.
- Margin.
- Mid-tender Interviews.
- Pre-qualification questionnaire.
- Private Finance Initiative.
- Procurement route.
- Tender evaluation.
- Tender processes.
- Things to avoid when tendering.
- Two stage tender.
- Invitation to tender.
- Tender documentation.
- Tender return slip.
- Tender settlement meeting.
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.