Firm bill of quantities
A bill of quantities (BoQ) is a document prepared by a cost consultant that provides project-specific measured quantities of the items of work identified by the drawings and specifications in the tender documentation. The quantities may be measured in number, length, area, volume, weight or time. A bill of quantities is issued to tenderers for them to prepare a price for carrying out the works.
The more precisely the work in a bill of quantities can be measured and described (i.e. the ‘firmer’ it is) the more accurate tenderers’ prices should be, the easier it will be to control costs and the fewer variations will be necessary. The process of identifying elements of construction works that can be measured and priced is known as 'taking off'.
A firm bill of quantities can be prepared when the design is complete, a detailed specification has been prepared and quantities can be accurately calculated. If there were no changes to the project requirements following the preparation of a firm bill of quantities, then the tenderer’s priced bill of quantities would be the same as the final cost of the contract. In practice of course there are always changes.
Where it is not possible to prepare a firm bill of quantities at the time of tendering, an approximate bill of quantities (or notional bill of quantities) might be prepared. This might be necessary, for example, if the design is relatively complete, but exact quantities are not yet known. However, this will tend to result in more variations during construction and so less price certainty when the investment decision is made.
Approximate bills of quantities can also be used during the design process as a tool for controlling design development.
[edit] Related articles on Designing Buildings Wiki
- Advantages of a bill of quantities.
- Approximate bill of quantities.
- Approximate bill of quantities vs approximate quantities cost plan.
- Approximate cost plan.
- Approximate quantities.
- Bill of quantities.
- Bill of quantities software.
- Common mistakes in bill of quantities.
- Cost plans.
- How to take off construction works.
- New Rules of Measurement.
- Priced bill of quantities.
- Quantity surveyor.
- Taking off.
- Types of bill of quantities.
- Working up construction works.
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.