Direct cost
|
Direct costs for goods and services are those costs incurred directly for production and include items such as raw materials, labour, equipment, software and power costs. Direct costs can be traced and attributed to a cost ‘object’ which may be a product, department, cost centre or project.
Indirect costs (sometimes called ‘overheads’) are those necessary to keep a production facility in business and include rent, insurance, advertising and marketing which, although they may be included in the cost of the product or service, they are still indirect costs because they do not vary directly with the volume of goods/services produced and are not easily attributable to a particular process or project.
The amount added to a product’s unit costs by indirect costs will vary according to production levels, as in the following illustration:
The direct cost of manufacturing a steel padlock is £1, made up of:
The factory’s monthly indirect costs (rent, equipment, marketing etc) = £50,000
In January, the factory makes 100,000 padlocks, so the indirect cost element attributed to each unit is £0.50p.
In February, the factory makes 200,000 padlocks, so the indirect cost element attributed to each unit is £0.25p.
But in both months, the indirect costs have not changed, the only variable is in how much indirect cost is incurred by each unit.
So, indirect costs do not vary directly with production levels, whereas direct costs remain dependent on production levels and will vary when production is increased or decreased.
NB Cost prediction, Professional Statement, 1st edition, published in November 2020 by the Royal Institution of Chartered Surveyors (RICS), defines direct costs as: ‘Costs incurred on labour, material, plant and equipment, etc., i.e. costs that are directly accountable to the project.’
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.
Accommodating the Victorian and Edwardian working woman. Book review.
Rethinking passive fire protection in design
PFP demands the same level of design rigour as structure or services.
38% of Gen Zs feel safe when a fire door is wedged open.
Stunning images from around the world
Shortlist for CIOB’s Art of Building photography competition.
Guidance for conversion of traditional pre-1919 stone buildings.
Industrial heritage in the Ruhr
A marked difference to the fate of industrial landscapes in the UK.



















Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.