Dilapidations
Dilapidations are breaches of leases due to the condition of the property being leased, either during or at the end of the lease period. This may result from mistreatment of the property or poor or absent maintenance or repairs that are required by the lease. Further work may also be required at the end of a lease to reinstate alterations that have been made to the property by the tenant.
Tenants should be clear about their responsibility for dilapidations and reinstatement when signing a lease or carrying out alterations and should budget and account for any necessary works during the course of the lease. If they fail to do this they face the prospect of unexpected, or unaffordable works, or having insufficient time to carry out the works before the end of the lease.
If the required works are not carried out, the landlord may issue a schedule of dilapidations, or a notice to reinstate near the end of the lease (or an interim schedule during the course of the lease).
If dilapidations works are not carried out by the end of the lease, the landlord may claim damages from the tenant (a terminal dilapidations claim). This may take the form of a ‘quantified demand’ setting out details of the landlord’s losses as a result of the dilapidations, which may include loss of rent due to repairs being carried out. However, the landlord cannot profit from this claim, so if for example the landlord does not intend to reinstate the property, this must be taken into account.
These issues may result in a period of negotiation between the tenant and landlord in an attempt to agree a settlement figure. If the negotiation process fails then alternative dispute resolution or court proceedings may be necessary.
The valuation of works required, or the loss of value to the property can be complex calculations, and so both parties may wish to appoint surveyors to offer advice and prepare the appropriate documentation. Further specialist advice may be necessary for complex components or aspects of a property, such as building services plant. Court proceedings may also involve expert witnesses.
A ‘Pre-Action Protocol for Claims for Damages in Relation to the Physical State of Commercial Property at Termination of a Tenancy’ (the 'Dilapidations Protocol') is available from the Ministry of Justice. This describes the conduct the court expects the parties to follow before commencing proceedings, setting out a process and timetable for the exchange of information, and establishing standards for the content and quality of schedules of dilapidations and quantified demands.
There is a separate Pre-Action Protocol for Housing Disrepair cases.
[edit] Related articles on Designing Buildings
- Alternative dispute resolution.
- Betterment.
- Break clauses in leases.
- Decay.
- Dilapidations claim.
- Deterioration.
- Dilapidations protocol.
- Forensic engineering in developing countries.
- Lease Negotiations - Tenants Checklist.
- Licence for Alterations for Apartment.
- Licence to alter.
- Opening up works for inspection and testing.
- Payment for dilapidations.
- Quantified demand.
- Rent-free period.
- Rent in administration.
- Rent review.
- Reversion.
- Sample retail lease.
- Schedule of condition.
- Schedule of dilapidations.
- Scott schedule.
- Supersession.
[edit] External references
- RICS, A clear, impartial guide to Dilapidations For use in England and Wales. November 2013
- Ministry of Justice, Pre-Action Protocol for Claims for Damages in Relation to the Physical State of Commercial Property at Termination of a Tenancy.
- Ministry of Justice, Pre-Action Protocol for Housing Disrepair.
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Guide to ISO 19650 for Architecture Firms (2026)
A user gives their low down.
A UK training and membership provider for mould remediation professionals.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
Independent NSI and BAFE study exploring how organisations are changing the way they buy fire safety services.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.


















Comments
[edit] .To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.