Quantified demand for dilapidations
Dilapidations are breaches of leases due to the condition of the property being leased. This may result from mistreatment of the property or poor or absent maintenance or repairs that are required by the lease. Further work may also be required at the end of a lease to reinstate alterations that have been made to the property by the tenant.
If the required works are not carried out, the landlord may issue a schedule of dilapidations, or a notice to reinstate. If dilapidations works are not carried out by the end of the lease, the landlord may claim damages from the tenant (a terminal dilapidations claim). This may take the form of a ‘quantified demand’ prepared by the landlord or their surveyor setting out details of the landlord’s losses as a result of the dilapidations.
The quantified demand might include:
- The cost of the repair works.
- The loss of value to the property.
- Holding costs.
- Loss of rent and service charge.
- Rates.
- Insurance.
- Security.
- Utilities.
- Cleaning.
- Finance costs.
- Fees.
- Consequential losses such as professional fees, legal fees, the cost of administration of the repair work and VAT. The legal basis for consequential losses should be set out.
However, the landlord cannot profit from this claim, so if for example they do not intent to reinstate the property (perhaps if the property is to be demolished or refurbished), this must be taken into account.
There may be a period of negotiation between the tenant and landlord in an attempt to agree a settlement figure. If the negotiation process fails then alternative dispute resolution or court proceedings may be necessary.
Valuation of the landlord’s losses can be complex, and so both parties may wish to appoint a surveyors to offer advice and prepare appropriate documentation. Further specialist advice may be necessary for complex components or aspects of the property, such as building services plant. Court proceedings may also involve expert witnesses.
A ‘Pre-Action Protocol for Claims for Damages in Relation to the Physical State of Commercial Property at Termination of a Tenancy’ (the Dilapidations Protocol) is available from the Ministry of Justice. This describes the conduct the court expects the parties to follow before commencing proceedings, setting out a process and timetable for the exchange of information, and establishing standards for the content and quality of schedules of dilapidations and quantified demands.
The protocol suggests that the quantified demand should:
- Set out clearly all aspects of the dispute, and set out and substantiate the monetary sum sought as damages in respect of the breaches detailed in the schedule as well as any other items of loss for which damages are sought.
- Set out whether VAT applies.
- Specify a date (being a reasonable time) by which the tenant should respond. This will usually be within 56 days after sending the quantified demand.
- Where the monetary sum sought is based on the cost of works, it should be fully quantified and substantiated by either an invoice or a detailed estimate.
- If the quantified demand includes any other losses, they must be set out in detail, substantiated and fully quantified. The landlord should explain the legal basis for the recovery of losses, e.g. whether they are sought as part of the damages claim or under some express or implied provision of the lease.
The quantified demand will generally be separate from the schedule of dilapidations but may be bound into the same document.
[edit] Related articles on Designing Buildings
- Alternative dispute resolution.
- Betterment.
- Break clauses in leases.
- Dilapidations.
- Dilapidations protocol.
- Lease Negotiations - Tenants Checklist.
- Licence for Alterations for Apartment.
- Rent-free period.
- Rent in administration.
- Rent review.
- Sample retail lease.
- Schedule of dilapidations.
- Scott schedule.
- Supersession.
[edit] External references
- RICS, A clear, impartial guide to Dilapidations For use in England and Wales. November 2013.
- Ministry of Justice, Pre-Action Protocol for Claims for Damages in Relation to the Physical State of Commercial Property at Termination of a Tenancy.
- Ministry of Justice, Pre-Action Protocol for Housing Disrepair.
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.