Stationary pump skills
Operators and relevant equipment management personnel should carefully read the operating instructions and master structural principles, operation and maintenance as well as pumping concrete operations.
The ground supporting the stationary pump should be flat and solid. The pump location should not only be convenient for the concrete mixing truck to enter and exit and feed to the hopper, it should also be accessible for the pumping distribution pipe in order to reduce pumping pressure loss. At the same time, it should be close to the pouring site and convenient for power supply and water supply.
In the process of concrete pumping, with the increment of pump pressure, pumping impact may force the pipe to move back and forth. This may result in pumping pressure loss, which can lead to damage of the pipe clamp and aprons as well as other issues.
After being connected, the concrete pump should be inspected in accordance with the operating instructions, and the machine should not be started until it meets the requirements.
When construction takes place in hot weather, it is advisable to cover the concrete conveying pipe with a wet straw bag, wet cover cloth and other materials to avoid direct sunlight and prevent the concrete from blocking the pipe.
Horizontal pipes of a certain length should be laid between the concrete pump and the vertical piping to ensure sufficient resistance to prevent the back flow of concrete.
When construction takes place in cold weather, concrete conveying pipes should be wrapped with insulation materials to prevent the concrete inside the pipe from freezing.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.