Stationary pump skills
Operators and relevant equipment management personnel should carefully read the operating instructions and master structural principles, operation and maintenance as well as pumping concrete operations.
The ground supporting the stationary pump should be flat and solid. The pump location should not only be convenient for the concrete mixing truck to enter and exit and feed to the hopper, it should also be accessible for the pumping distribution pipe in order to reduce pumping pressure loss. At the same time, it should be close to the pouring site and convenient for power supply and water supply.
In the process of concrete pumping, with the increment of pump pressure, pumping impact may force the pipe to move back and forth. This may result in pumping pressure loss, which can lead to damage of the pipe clamp and aprons as well as other issues.
After being connected, the concrete pump should be inspected in accordance with the operating instructions, and the machine should not be started until it meets the requirements.
When construction takes place in hot weather, it is advisable to cover the concrete conveying pipe with a wet straw bag, wet cover cloth and other materials to avoid direct sunlight and prevent the concrete from blocking the pipe.
Horizontal pipes of a certain length should be laid between the concrete pump and the vertical piping to ensure sufficient resistance to prevent the back flow of concrete.
When construction takes place in cold weather, concrete conveying pipes should be wrapped with insulation materials to prevent the concrete inside the pipe from freezing.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.