[edit] Introduction
The Smart Export Guarantee (SEG) is a government-backed programme that became available on 1 January 2020. The SEG initiative was introduced in conjunction with the phase out of the Feed-in Tariff (FIT) programme, which was discontinued for new applicants on 31 March 2019.
[edit] Background
The SEG was brought forward by the Department of Business Energy and Industrial Strategy (BEIS) on 10 June 2019. It was introduced by the Smart Export Guarantee Order 2019 - which amended the electricity Supply Licence Conditions (SLCs).
The SEG requires licensed suppliers (referred to as SEG licensees) with at least 150,000 domestic electricity customers to offer at least one SEG compliant tariff to any eligible generators (referred to as SEG generators). Other suppliers may participate on a voluntary basis. A list of mandatory and voluntary SEG licensees is available from the Ofgem site.
To confirm their status, all licensed electricity suppliers must notify Ofgem by 14 February each year. The status of a supplier then applies for the duration of the relevant SEG year (1 April - 31 March).
The announcement from Ofgem explained that the SEG would act as an incentive for both domestic and commercial energy generators able to export electricity up to a capacity of five megawatts (MW) - or up to 50kW for micro-combined heat and power - to the grid. Eligible small-scale low-carbon generators include:
- Solar photovoltaic (solar PV)
- Wind
- Micro-combined heat and power (micro-CHP)
- Hydro
- Anaerobic digestion (AD)
In order to be eligible, generation technology must be installed within Great Britain.
[edit] Payment arrangements
The SEG requires licensees to pay small scale generators for low-carbon electricity which they export back to the National Grid. This arrangement is permitted provided the parties satisfy the rest of the eligibility criteria. For more information, see Guidance for SEG Licensees and Smart Export Guarantee: Guidance for generators.
Licensees dictate the payment rate, the contract length and other terms for generators. There is no prescribed tariff rate, type or length, but the tariff must offer an above zero pence rate per kilowatt hour (kWh) of export at all times in order to be compliant.
SEG generators are paid an export tariff which serves as reimbursement for the electricity that is exported back to the National Grid.
[edit] SEG v FIT
Both the SEG and FIT were introduced to promote commercial and residential investment in renewable microgeneration technology. But the SEG does not directly replace FIT.
One significant difference is that FIT pays for energy generation and export; the SEG only pays for exported energy. However, some licensees do permit generation arrangements to stay in place when generators sign up for the SEG tariff.
Another difference is tariff rate determination. Under FIT, this rate was dictated by Ofgem. With the SEG, it is the licensee that determines this rate.
Those who signed up to FIT prior to its discontinuation in 2019 will continue to receive payments for the duration of their contract.
[edit] Related articles on Designing Buildings Wiki
- Domestic micro-generation.
- Electricity supply.
- Energy harvesting.
- Feed in tariff.
- Microgeneration.
- Microgeneration Certification Scheme 2020.
- Micro-CHP.
- Ofgem
- Power generation.
[edit] External resources
Featured articles and news
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.