Single project professional indemnity insurance
Single project professional indemnity insurance (SPPI) is becoming an increasingly popular technique for risk management and is used by owners, developers and contractors.
Aimed primarily at large construction projects, SPPI can control the scope of insurable risks and so reduce costs. One of its main benefits is that it gives the project owner/employer/developer full control over the insurance for a project and guarantees that all the diverse interests, liabilities and risks of those involved in the venture are covered. For main contractors and subcontractors working on a specific project, SPPI can consolidate insurance cover into one policy negotiated, purchased and managed by a single sponsor.
Unlike conventional annually-renewable policies, SPPI offers advantages for project owners and joint-venture operators. Benefits of SPPI include:
- Premium costs to cover the entire project are known right from the start; owners do not have to bear additional costs from premiums relating to contractors' cover for the project;
- Owners have certainty of cover for up to 10 years post-project completion. This compares favourably with annually-renewable policies where there is no guarantee that contractors and sub-contractors will renew their individual policies after completion;
- Projects are usually covered against the true risks as project owners have more control over the type of cover, policy duration and limits of an SPPI policy than they do over their contractors’ individual PI policies;
- Being project specific, the policy cannot be diminished by claims from other projects – as may sometimes happen when relying on a contractor’s annual insurance;
- Avoids the danger of contractors setting their liabilities at an unrealistically low level. This is because SPPI caters to the specific requirements of a project.
- Owners are covered for all contractors and consultants involved on the project, thereby reducing time spent on management and negotiation;
- Owners are protected against delays arising from contractor/sub-contractor bickering over who is responsible for an error or oversight;
- SPPI policies cannot normally be altered or cancelled by insurers as might be the case with annual policies – these can alter at renewal and may not comply with contract requirements;
- Avoids convoluted claims settlement issues by eliminating the need for numerous insurers for each partner in a joint venture.
[edit] Related articles on Designing Buildings Wiki
- Building Users' Insurance Against Latent Defects.
- Collateral warranties.
- Contractors' all-risk insurance.
- Contract works insurance.
- Decennial liability.
- Design liability.
- Directors and officers insurance.
- Employer's liability insurance.
- Excepted risk.
- Flood insurance.
- Future of construction insurance.
- Indemnity to principals.
- Integrated project insurance.
- JCT Clause 6.5.1 Insurance.
- Joint names policy.
- Latent defects insurance.
- Legal indemnities.
- Legal indemnity insurance.
- Non-negligent liability insurance.
- Performance bond.
- Professional Indemnity Insurance.
- Public liability insurance.
- Residual value insurance.
- Reverse premium.
- Specified perils.
- Subcontractor default insurance (SDI).
- Warranty.
Featured articles and news
The principles and art of the possible. Book review.
From horse and cart to hypermarket.
Interdependent and interconnected
How elements and processes work together in a systems approach.
Quality Management in Construction
CIOB offers digital guide to proactive methods of working.
Looking ahead to career advancement
Tech will drive professional development in fields tied to infrastructure.
Gereja Ayam (aka the Chicken Church)
The idea for the structure emerged from the architect's dream.
Making adjustments to flues and chimneys
Changing air tightness requirements prompt testing and revisions.
Government takes steps to revise building safety legislation.
Biocement building blocks from bacteria
Product can be 'grown' into bricks or used as a self-healing building material.
CLC offers guidance on contract claims and disputes
Anticipating COVID-19's continuing construction disruptions.
Availability payment arrangements involve project performance.
EU responds to COVID-19 with NextGenerationEU plan.