Project management fees
Project management (PM) is a broad title, used for a range of roles in different professions, from software to construction. In the construction industry a project manager (PM) runs the project, ideally from inception to completion (or part thereof), often including elements of initial building use. They are typically appointed by and liaise with, the client (or project owner) to oversee, a team that designs and constructs the project, in exchange for a fee.
The fee can be considered on a
- Time related charge basis (or as a pay for work retainer fee).
- Fixed charge (or per item) basis.
- By percentage of the overall construction cost.
- Less common is a pay for access (to knowledge) consultant retainer.
The fee generally is paid, by a combination of advances, arrears or with delivery on progress, such as gateways and can include the statutory fees required for the various building permissions or not. The fees for the PM, as well as for the contractor team may also be subject to retention (or retainage in the US) which is an amount held back from the final payment (or account) until total completion.
In simple terms the PM fee level relates to the project scale and complexity, the scope, the stages of project involvement in much the same way as any building design and construction fees.
- The project scale is here most often defined by the overall construction budget (thus impacted by complexity and timeframe). This may be used to calculate the PM fee as percentage of the total agreed price (sometimes within the range 1-3 %). A fixed charge might be agreed for certain elements of work, paid in arrears when work is delivered. In smaller projects or early stages of larger projects, (where cancellation risks might be higher) fees might be charged by hours worked.
- The scope of services describes the tasks that are expected to be performed in return for the fee. This often includes managing the consultants, assessing risks, programme planning and cost control. Not to be confused with the construction activities of the project, these are described in the scope of works (or in the more detailed and prescriptive schedule of works) The fee payment may be based on complete parts of scope or for the different stages of work. One service the PM might also offer and be responsible for is that of contract administration.
- The stages of a project are effectively from its outset to occupation. The Project Management Institute (PMI) Project Management Body of Knowledge (PMBOK), The Royal Institute of British Architects (RIBA) and Designing Buildings all describe these slightly differently. Which-ever is referenced, a different fee arrangement for each stage is quite common and will likely form part of the contract.
A PM role may be divided into (or supported by) other roles: An architectural or design PM focusses on design co-ordination. A construction PM, may be appointed at construction stages to oversee site works. A Building Information Model (BIM) PM, finance PM, claims PM are other namesake roles.
In traditional contract appointments this role may have been fulfilled by a project architect or engineering team, often with sub-roles such as planning, design, technical and site architects. In design and build contracts it may be fulfilled by design consultants and the main contractor team or a mixture of the above. Novation is a process where contractual roles, responsibilities and rights might be transferred from one party to another midway through a project, for example where a design team initially works for the client and is then novated to the contractor or PM who becomes the contract administrator working directly for the client.
There are numerous different structures within which a construction project, as well as any other type of project might be managed, along with methods and strategies to schedule or manage progress. Some examples of these might include resource allocation methods such as critical path method (CPM), gantt charts, program evaluation and review techniques (PERT), lean or agile construction, just In time, line of balance (LoB) though this list is not exhaustive.
All of the above will influence the specific tasks of the PM, as well as the experience of the PM, the type of procurement route, the construction contract, the terms of appointment, the fees agreed and in the end the level of fees and how and when the fees are paid.
[edit] Related articles on Designing Buildings
Featured articles and news
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.