Programme and project management
The term programme management is closely aligned with the term project management, but the two have slightly differing meanings. Another related term is also portfolio and management
Programme management refers to the management of a series of interrelated projects that may be carried out repeatedly or continuously in order to support an ongoing process. The outcome of a programme may be intangible and the projects may change over time as the programme evolves. The process of business improvement may be considered to be a programme, as it is continuous, changing, and the outcomes may be difficult to define. Programmes will tend to be integral to the businesses carrying them out and will generally run in line with the business calendar.
Project management is usually more specific and can involve the briefing, planning, co-ordination, execution, control, monitoring, and completing of the specific project. The project can be almost anything that has a defined outcome, usually with a defined delivery process. In construction terms this can be a temporary, or permanent building, landscape, refurbishment or reconfiguration that has been defined as the project.
Portfolios are groups of projects that need not be related, but which have been packaged together, portfolio management relates to the development and delivery of the various projects, targetting the efficient use of resources.
See also programme management, project management and programme V project.
[edit] Related articles on Designing Buildings
- CIOB articles,
- Code of Practice for Programme Management in the Built Environment. Second edition.
- Code of Practice for Project Management for the Built Environment, 6th edition.
- Design management.
- Portfolio v programme.
- Preliminary business case.
- Project execution plan.
- Project management.
- Risk management.
- Value management.
Featured articles and news
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.