Price certainty in the construction industry
Price is the amount paid for acquiring a product or a service. It is not the same as cost, which is the amount incurred in making something or providing a service. Price is therefore understood from the buyer’s perspective while cost is understood from the producer/supplier's perspective.
Price certainty can describe a state of affairs whereby before a project or part of a project starts, a contractor is be able to buy materials and components at a fixed, pre-agreed price which is both competitive (possibly below the market average) and advantageous. Certainty is provided by the supplier that the goods will be supplied at the agreed price and at the right time, possibly over a regular period. The basis of price certainty is forward planning and pre-agreement.
For example, a contractor or subcontractor may be able to order a pre-agreed volume of fuel every month at a fixed price for a specified future period. This provides a greater assurance of supply and helps budgeting as it removes the uncertainty of fluctuating fuel costs.
On the supply side, price certainty may contribute to cost certainty in that as a result of the pre-agreement, the supplier receives a fair price for the product or service which covers their production and/or supply costs and leaves them with a profit.
In the absence of agreement, their may be uncertainty about price.
[edit] Related articles on Designing Buildings Wiki
- Budget.
- Capital costs.
- Construction costs.
- Construction price and cost indices.
- Cost control.
- Cost information.
- Cost of building.
- Cost overruns.
- Cost plans.
- Cost vs price.
- Front-loaded costs.
- Estimate.
- Hard costs v soft costs.
- Irrelevant cost.
- Operational costs.
- Other development/project costs.
- Relevant cost.
- Whole life cost.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.























