Precedent study
A precedent study, sometimes called precedent analysis or precedent research, might be considered as a key design tool for Architecture and Engineering aswell as planning. Many precedent studies are in effect case studies, where an already constructed building is studied in detail, perhaps focussed on a particular theme, as a way to inform a potential future design or scheme. Indicatively the difference between a case study and a precedent study is that a case study is normal a study on a single building in detail, whereas a precedent study may be a number of different buildings with particular features that may connect them to a possible future scheme.
Digital Twin Toolkit, Developing the business case for your digital twin, published by cdbb in February 2021, defines a case study as: ‘…a backward-looking description of the implementation of a solution. It outlines the initial expectations and potential triggers to launch the project, the journey (steps taken, blockers encountered, enablers), the solution itself (data, technology involved …), the learnings, and final outcomes (costs and benefits). A case study may be referred to as a use case scenario and may reference use cases.’
Designing Buildings has a wide range of case studies, see here. For example here is a case study on the BEST Products showrooms design and constructed by SITE architects in the 1970's. The case study looks in some detail at these projects which perhaps set a precedent for postmodern, playfully whimsical, sculptural buildings (Sculpture in the Environment). One might also chose to look at specific themes surrounding these types of buildings as using visual trickery or illusion in their design solutions and perhaps include these as well as other projects in a precedent study of illusion in Architecture.
In terms of planning, precedent studies or analyses may be carried out over a particular area, borough or region to inform planning policy on different aspects of development, for example to look at housing typologies, density, live/work patterns etc. In terms of planning, precedents are however not formally accepted as a material consideration, but precedent studies can be helpful to inform planners, local residents and the public of the reasoning behind certain design choices.
[edit] Related articles on Designing Buildings
Featured articles and news
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.