Pre-installation building inspection PIBI
Pre-installation building inspections (PIBIs) were introduced in PAS:2030 after the first version in 2012 as early as 2017, they were further strengthened in the 2019 with cavity wall installations requiring an independent PIBI, stipulating that 100% of installations to have a pre-check with at least 1 in 10 properties physically inspected to ensure quality. In the 2023 version of PAS:2030 PIBIs were required at the measure level and not just at the lodgement level (ie when a project is being logged).
PAS 2030:2023, Installation of energy efficiency measures in existing dwellings, Published by BSi in 2024, defines a pre-installation building inspection as an: ‘inspection of an installation location undertaken by or on behalf of the Retrofit Installer prior to commencement of installation. NOTE 1 The inspection confirms that the retrofit design provided is complete, conforms to this PAS, can be fulfilled at the location specified and that the proposed installation does not result in noncompliance with statutory requirements and/or generally accepted industry good practice NOTE 2 The application of this inspection to particular measures is addressed through the pre-installation building inspection requirements and the inspector competence requirements in the relevant measure-specific Annex.’
[edit] Related articles on Designing Buildings
- Air permeability testing.
- Air tightness in buildings.
- BREEAM.
- BREEAM Testing and Inspection Building Fabric.
- Building Control Performance Standard 6: Site inspection.
- Cold bridge.
- Energy audit.
- Joint Inspection Team (JIT) for Building Safety in Wales.
- Performance gap.
- Site inspection.
- The history of non-domestic air tightness testing.
- Thermal imaging of the building fabric in the net zero world.
- Thermal imaging to improve energy efficiency in building design.
- Thermographic survey of buildings.
- Thermography for traditional buildings.
- U-value.
- Workmanship
Featured articles and news
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.