Assembly area
Contents |
[edit] Introduction
There are various definitions for the term ‘assembly area’, as outlined below.
[edit] Manufacturing
First, it can be a dedicated area (as part of a larger space) in which components are assembled. In a production plant, there may be a dedicated space for collecting, combining or assembly of components that is quite distinct from the manufacture of the components, allowing a finished- or semi-finished product to leave the factory.
However, many modern factories are either not large enough or not specialised enough to encompass both production and assembly under one roof and so are geared to either component manufacture or component assembly. The car industry is a typical example where many components are brought in from a diverse supply chain and assembled under one roof. But even in these cases, there may be an assembly area.
[edit] Construction
On a building site, an assembly area may be used for:
- Assembling prefabricated components delivered to site as a kit.
- Assembling tools and other site equipment or making repairs.
- A safe zone (see below).
[edit] A safe zone
An assembly area may also be a safe zone located a certain distance from a building where staff and other building users can gather in the event of an emergency. Many companies include a safe zone or ‘place of safety’ as part of their evacuation plans in the event of a fire or other emergency. The aim is to achieve an orderly transfer of building occupants to a point where they will be safe and accounted for. There may also be a safe area for this purpose on a construction site.
See Place of safety.
[edit] A leisure space
An assembly area may be any space or room that allows individuals to gather for social, recreational, educational, civic or amusement purposes. For example, schools typically have a large, multi-functional space where 'assemblies' take place.
For more information see: Assembly and recreation definition.
[edit] Related articles on Designing Buildings Wiki
- Assembly.
- Assembly and recreation definition.
- Assembly drawing.
- Design for Manufacture and Assembly (DfMA).
- Escape route.
- Evacuating vulnerable and dependent people from buildings in an emergency FB 52.
- Fabrication.
- Means of escape.
- Modern methods of construction.
- Place of safety.
- Protected escape route.
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.