Off-site manufacture for construction: Building for change
In July 2018, the House of Lords Science and Technology Committee published a report suggesting that off-site manufacture (OSM) could offer many solutions to the construction industry’s problems.
‘Off-site manufacture for construction: Building for change’ claims that the industry will struggle to meet the UK’s housing and infrastructure needs without a ‘radical overhaul’ but that fragmentation of the industry is currently presenting an obstacle to change.
The report suggests OSM has the potential to increase productivity, improve quality and reduce environmental impacts, as well as reducing the demand on labour which is predicted to increase as a result of Brexit and the skills shortage.
Earlier in 2018, the government adopted a ‘presumption in favour’ of OSM for its projects and the report recommends the development of key performance indicators which could assess the success of this policy. Where OSM is not used on a project, the report said, the government should publish an explanatory statement.
Chairman of the committee Lord Patel said:
“There are clear and tangible benefits from off-site manufacture for construction which make a compelling case for its widespread use. We heard evidence that OSM could increase productivity in the sector by up to 70%.
“The construction sector’s business models are no longer appropriate and are not supporting the UK’s urgent need for new homes and infrastructure. The construction sector needs to build more trust and create partnerships so that companies can work together to improve the uptake of off-site manufacture, and the Construction Leadership Council should provide the necessary leadership.
“The role of the government and the wider public sector is pivotal in a move to greater use of off-site manufacture. The report sets out actions that the committee thinks the government should take including implementation of the Construction Sector Deal, committed execution of the ‘presumption in favour’ of off-site manufacture and a greater move to procuring for whole-life value rather than lowest cost.”
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Design for Manufacture and Assembly (DfMA).
- Fragmentation of the UK construction industry.
- Modern methods of construction.
- Off site materials.
- Off-site construction.
- Offsite manufacturing.
- Offsite manufacturing and standardised design.
- Off-site prefabrication of buildings: A guide to connection choices.
- Prefabrication
Featured articles and news
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction (HKIC) and The Chartered Institute of Building (CIOB) sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.





















