Invitation to negotiate for PFI
The invitation to negotiate for private finance initiative (PFI) projects is equivalent to the invitation to tender for traditional contracts. It sets out the project particulars and the specific requirements for bids. It may be a development of the information pack if one was issued to potential bidders with pre-qualification questionnaires.
The invitation to negotiate might include:
- Letter of invitation to tender (or invitation to negotiate).
- Instructions to tenderers explaining the tender process.
- Form of tender.
- Preliminaries
- Form of contract, contract conditions and amendments.
- The timescale for the tender process.
- An explanation of how queries will be dealt with.
- The evaluation process and any evaluation criteria.
- Policy in relation to alternative or non compliant bids.
- Policy for providing feedback to unsuccessful tenderers.
- Draft contract (including the payment mechanism).
- Pre-construction information.
- Site waste management plan.
- An output-based specification describing the clients objectives for the project.
- A description of what is required in response to the invitation to negotiate (including any requirements for method statements)
- A pricing schedule.
NB. Private finance initiative projects are generally tendered after the project brief has been prepared, without the benefit of design. However if a smart PFI route is adopted a concept design will have been prepared and so the invitation to negotiate might include drawings and prescriptive or performance specifications.
For a detailed description of the tender process for private finance initiative projects see the free work plan stage: Public project: PFI tender.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.