How to serve a party wall Notice
Contents |
[edit] The Complete Guide to Serving Party Wall Notices
If you're planning construction or renovation work on your property and share a boundary or wall with your neighbour, you are legally required to comply with the Party Wall etc. Act 1996. The first step in this process is serving a Party Wall Notice. This guide will explain the exact process of serving a Party Wall Notice, ensuring you meet your legal obligations and maintain good relations with neighbouring property owners.
[edit] Step 1: Understand the Party Wall Notice Requirements
A Party Wall Notice is a formal document that informs adjoining property owners about proposed construction work that could affect a shared boundary or structure. The types of work that require a Party Wall Notice include:
- Building on or at the boundary of two properties.
- Excavating within 3 to 6 meters of a neighbouring building.
- Making structural changes to a shared (party) wall.
Before you serve the notice, it is essential to determine the type of work you’re planning and its potential impact on neighbouring properties.
For professional advice tailored to your situation, consider consulting Icon Surveyors, experienced in all aspects of Party Wall Surveying and serving Party Wall Notices.
[edit] Step 2: Types of Party Wall Notices
There are three types of Party Wall Notices:
- Line of Junction Notice: If you plan to build a new wall on the boundary.
- Party Structure Notice: If the work affects an existing party wall, such as altering it or repairing it.
- Notice of Adjacent Excavation: If you plan to dig near the foundation of a neighbouring building.
- Each type of notice must include specific details about the proposed work, including:
- The full names and addresses of all property owners involved.
- A detailed description of the planned work.
- The proposed start date of the work.
To ensure your notice is compliant and correctly served, it's advisable to have a qualified surveyor assist with this process. Learn more about the specifics from Icon Surveyors, specialists in handling Party Wall matters.
[edit] Step 3: Serving the Notice
The next step is serving the Party Wall Notice. You can do this in one of the following ways:
- Hand Delivery: Deliver the notice personally to the adjoining owner.
- Mail: Send the notice via recorded delivery to ensure there is proof of receipt.
- Post on the Property: If the adjoining owner’s address is unknown, the notice can be posted on a conspicuous part of the property.
Once the notice has been served, the adjoining owner has 14 days to respond. The response options are:
- Consent: The neighbour agrees to the work proceeding as outlined in the notice.
- Dissent and Appoint a Surveyor: The neighbour dissents and appoints their own Party Wall Surveyor. Alternatively, both parties can agree to use a single surveyor, known as the Agreed Surveyor.
- No Response: If there is no response within 14 days, it is considered a dissent, and a surveyor must be appointed to create a Party Wall Award.
For assistance in serving the notice correctly and navigating any potential disputes, you can rely on Icon Surveyors, who offer specialised services to manage the Party Wall process from start to finish.
[edit] Step 4: Appointing Surveyors and Drafting the Party Wall Award
If the adjoining owner dissents or does not respond, surveyors must be appointed. The appointed surveyor(s) will prepare a Party Wall Award, which is a legally binding document detailing:
- The work to be done.
- The schedule of work.
- Rights and responsibilities of each party.
- Protective measures to minimise damage or disruption.
The Party Wall Award also includes a Schedule of Condition report, which records the state of the adjoining property before work begins. This ensures that any claims for damage caused by the work can be verified.
[edit] Step 5: Final Steps and Compliance
Once the Party Wall Award is agreed upon and signed, work can commence. It’s important to adhere strictly to the details outlined in the Award to avoid disputes or potential legal action. During the work, your surveyor may perform periodic inspections to ensure compliance with the terms of the Party Wall Award.
[edit] Conclusion
Serving a Party Wall Notice can be a complex process, but understanding each step and seeking professional guidance can make it straightforward and manageable. By ensuring that you serve the correct notice in the proper manner, you minimise the risk of disputes and ensure a smoother construction process. For expert assistance with serving Party Wall Notices and managing Party Wall Agreements look at the header above.
Featured articles and news
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.