How to appoint a contractor
Contents |
[edit] Introduction
Contractors are organisations appointed by clients (sometimes referred to as employers) to carry out construction works. This role is vital to the success of a project, and so great care should be taken to ensure an appropriate contractor is selected. This may involve seeking advice from consultants if the client is inexperienced.
In the construction industry, the process of selecting a contractor is generally referred to as ‘tendering’ and involves preparing tender documents that describe the project, and then inviting tender submissions from prospective contractors from which as selection can be made.
This article describes the process commonly followed for appointing the contractor after they have been selected. Other processes may be used on certain types of projects, such as Private Finance Initiative (PFI) projects.
- For information about how to put together a list of potential contractors see: How to find a contractor.
- For information about selecting a contractor from a list of potential contractors see: How to select a contractor.
[edit] Contract award
All tenderers should be informed of the decision to award the contract to a particular tenderer.
If OJEU procedures are being followed, it may be necessary to publish a formal contract award notice. A ‘standstill period’ may also be required. This is a pause of at least 10 calendar days between the decision being notified to all tenderers and the final contract conclusion. This allows for suppliers to challenge the decision.
[edit] Contract engrossment
Contract engrossment is the process of preparing the final agreed form of contract and its schedules and appendices so that it can be executed (signed).
Typically, the contract administrator (or sometimes the cost consultant) will collate the contract documents on behalf of the client and arrange for the printing and execution of two copies, one for the client and one for the contractor. Alternatively, the client might retain one executed contract, with certified copies being issued to the contractor, this can avoid potential errors in preparing two contracts for execution.
It is vital to ensure that the contract uses the correct legal names for the contracting parties. This is not always as straight-forward as it sounds, and errors can render contracts unenforceable.
See for example:
- Genesis Housing Association Limited v Liberty Syndicate Management Limited.
- Derek Hodd Limited v Climate Change Capital Limited.
- Westshield Civil Engineering Ltd and Westshield Ltd v Buckingham Group Contracting Ltd.
The contractor may also be required to provide a performance bond, warranties, evidence of insurance cover and so on.
Contract award and contract execution may not necessarily happen at the same time. In fact it is relatively common (although not advisable) for contracts to remain unsigned until well after work has begun.
Contracts may be executed under seal (signed by the parties, witnessed and most importantly made clear that they are executed as a deed) or under hand (a 'simple contract' that is just signed by the parties).
Simple contracts and contracts under seal have different limitation periods. An action founded on simple contract cannot be brought after six years from the date on which the cause of the action accrued. The limitation period for a contract under seal is 12 years. In addition, unlike a simple contract, a contract under seal does not have to be supported by valuable consideration (payment).
See Contracts under seal v under hand for more information.
[edit] Related articles on Designing Buildings Wiki
- Construction contract.
- Contract award.
- Contract documentation.
- Contract engrossment.
- Contract negotiation.
- Contracts under seal v under hand.
- How to find a contractor.
- How to select a contractor.
- Procurement route.
- Project plans for building design and construction.
- Tender documents.
- Tender process.
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.