Home thoughts from abroad: Immigration
‘Give me your tired, your poor, your huddled masses yearning to breathe free.’ |
The Statue of Liberty quotation above captures our current predicament; the scale of global labour migration during the past 30 years has far exceeded any historical precedents. The ‘push’ factors which contributed to this worldwide migration trend are well known. Easier international travel, plus legislative and administrative reforms in support of ‘globalization’, had the effect of lowering previous barriers to free movement.
Meanwhile, large geographical disparities in wealth – further accentuated by crises, including the collapse of the former Soviet bloc – pushed many workers to make good use of their new freedoms by migrating.
If these developments explain the ‘push’ to migrate, what then were the ‘pull’ factors which drove demand for migrant workers from the construction industries in these richer countries? And what impact did immigration have on these countries’ construction employment and skills systems?
The answers, according to the book entitled Work and Labor Relations in Construction: An International Perspective, depend largely on whether the employment and skills system in question originally aligned with a ‘high-road’ or a ‘low-road’ approach – as described in my last blog.
Until the 1990s, local laws and institutions in countries such as Germany, Scandinavia and Benelux helped preserve a level playing field based on ‘high-road’ practices. These included strong support for direct employment and heavy investment in skills development – resulting in a fully trained, productive and functionally flexible domestic workforce.
These protections began to come under pressure with the advent of increased access to workers from overseas and other liberalising measures, most notably the roll-out and expansion of the EU’s Single Market.
Sensing an opportunity to escape the costs and other constraints of local ‘high road’ systems, some industry clients started to engage main contractors from new, lower-income member states, such as Poland, the Czech Republic and the Balkans. These main contractors inevitably brought in subcontractors and workforces from their home regions. In time, new competitive pressures drove many local contractors to follow suit.
For ‘high-road’ industries, therefore, the advent of lower paid, often lower skilled workers from abroad largely went against the grain of their existing employment and skills systems, and with potentially disruptive – although not yet fatal – effects.
By contrast, large-scale labour migration mostly went with the grain of ‘low-road’ systems such as those of post-Soviet Russia and the UK. Here, workforce training, skill levels and productivity were already comparatively low, and domestic regulation of employment and occupational competence standards generally weak.
In this context, the ‘pull’ factor was mainly a need to keep workforce numbers up, given the inability of a system based on minimising investment in employing and training people to do this for itself.
How does this short global history lesson help us understand where we in the UK find ourselves in 2021?
First off, the UK’s migration merry-go-round has come to a shuddering halt – initially with the 2016 EU referendum and finally, this year, with the imposition of a new, more restrictive post-Brexit immigration regime.
Predictably, this has given rise to complaints of construction skills shortages – a risk further aggravated, by large numbers of EU migrants returning home during the COVID crisis of 2020/2021.
Assuming the Home Office does not give in to pleas for the immigration tap to be turned back on – or does so only as a temporary measure – it seems the wider UK construction industry will eventually have no option but to acknowledge the unsustainability of its ‘low-road’ model in a post-Brexit world.
Equally, greater attention will need to be paid to rebuilding industry’s capacity to employ and train our own people properly.
To a degree, this is already happening, albeit in a mostly stop-start, reactive and disjointed way.
For my money, another important part of UK construction transforming itself must be an end to parochialism. The industry needs a greater willingness to learn from the ‘high-road’ systems still operating quite successfully – despite recent disruptions – close to our own shores.
We must also end the UK’s unfortunate habit of quick-fixes and siloed thinking. The industry needs a better understanding of employment and skills as a complex system that only works when various interconnected and interdependent elements are all properly aligned.
This article originally appeared on the ECA website. It was written by Andrew Eldred, Director of Employment and Skills and published on 9 August 2021. It is part of a series of articles on the ECA website based on the book entitled Work and Labor Relations in Construction: An International Perspective.
--ECA
[edit] Related articles on Designing Buildings Wiki
- Articles by the Electrical Contractors' Association (ECA).
- Brexit.
- Home thoughts from abroad: skills development.
- Immigration skills charge.
- Post-Brexit vision for construction.
- Skills shortage and Brexit.
- Tackling the construction skills shortage.
- UK Points-Based Immigration System 2020.
[edit] External resources
Featured articles and news
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Building trust with customers through endorsed trades
Commitment to quality demonstrated through government endorsed scheme.
New guidance for preparing structural submissions for Gateways 2 and 3
Published by the The Institution of Structural Engineers.
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.