Dry-bulb temperature
Dry-bulb temperature (Tdb, DBT or Td), is a measure of air temperature. It is referred to as dry-bulb temperature because the thermometer bulb is dry and so the temperature recorded does not vary with the moisture content of the air. This is as opposed to wet-bulb temperature which is the temperature recorded by a thermometer that has its bulb wrapped in cloth and moistened with distilled water. Wet-bulb temperatures are the same as dry-bulb temperatures at a relative humidity of 100%, but otherwise wet-bulb temperatures will be lower than dry-bulb temperatures due to the cooling effect of evaporation (described as wet-bulb depression).
A sling psychrometer holds both wet and dry-bulb thermometers and can be used to express the physical and thermal properties of moist air on a psychrometric chart.
Dry-bulb temperature can be measured by a thermometer exposed to the air but shielded from radiation and moisture. It can be expressed in Celsius (C), Fahrenheit (F) or Kelvin (K).
Dry-bulb temperature can be used as to express a component of thermal comfort. For example, the wet bulb globe temperature index (WBGT) is widely used for the assessment of heat stress and combines wet-bulb temperature, dry-bulb temperature and globe temperature (mean radiant temperature).
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
















