Digitally built britain
Contents |
[edit] Introduction
All central government funded projects should have been delivered using 3D collaborative BIM by 2016. This initiative was later defined as BIM Level 2 and detailed in various published specifications over a 5-year period until it was eventually superseded in 2018 by a new international standard, BS EN ISO 19650.
Yet still, ISO 19650 has not been adopted by even half the industry yet, and some sectors haven’t been touched by it at all.
It’s no wonder then that the industry largely has a level of scepticism as to the importance and necessity of the standard, but it will become mandatory, probably sooner than we all think.
According to a survey of nearly 500 construction businesses based in the UK, we believe as an industry that our work will be fully compliant with ISO 19650 by 2027. Just 5 years from now.
[edit] Complying to ISO 19650
That’s not a government target. It’s not a forecast made by an industry body. It’s what the industry says, the people on the ground delivering projects.
Maybe it won’t be government targets or mandates that are the driving force behind digital transformation, but other legislation such as the Building Safety Bill; this will in effect be a mandate as it will be putting a legal responsibility on building owners and those who build their assets.
What’s so frustrating is the misconception carried across the industry, by those who aren’t fully aware of what is required to comply. Probably due to the way in which the first iteration was written and after so many amendments, who can blame the industry for misunderstanding?
ISO 19650 is commonly referred to as BIM. In fact, the word (or acronym) BIM is bandied around a lot, without full appreciation of what it means to be BIM compliant.
[edit] BIM
Most of the misconception has been brought about by what BIM stands for. Building Information Modelling. Therefore, when people think about BIM, they think about models. To try and counter this, we like to promote that the M in BIM should stand for management, rather than modelling. BIM could (should) stand for Building Information Management – where the information is derived from data and documentation collected at every stage of the project lifecycle, not just models.
BIM is the accepted and recognised term, associated with ISO 19650, but those who are ISO 19650 compliant will know that the most important element of a BIM enabled project is the quality of the data which is held for that project. That data should cover the project’s whole lifecycle, from conception through to a digital O&M manual and enabling the whole operational phase through to demolition and repurpose.
[edit] Managing Data
Traditionally, project information collated through the various stages of a construction project has caused much frustration when it comes to the building handover. Too often there is a lack of any structure due to it being gathered from a vast number of different sources in an inconsistent way. It will be largely unsearchable and because it hasn’t been managed throughout and updated as necessary, it will be flawed, full of gaps and ultimately, considered unreliable come project handover.
In today’s world, digital management of data allows repetitive tasks to be automated, increasing efficiency and ensuring accuracy. Introducing structure and search functionality allows for reliable data at handover, but it also ensures ease of access to data which can be used and re-used for multiple purposes throughout the project lifecycle.
The most important benefit of a BIM enabled project is the ability to save time, reduce risk and increase profitability. And this can't be said loud enough - it's not just about models!
To create a digitally built Britain, everyone across the supply chain from the beginning of a project to the very end, should be involved in managing digital data and converting their processes. With this, the construction industry has larger potential to expand and create more innovative methods of working. As an industry, we must understand the business specific requirements and align them with the industry standards to advance towards a digitally built Britain.
--AIMIS Written by Matt Samways, Managing Director of AIMIS
[edit] Related articles on Designing Buildings
- BIM.
- BIM articles.
- Centre for Digital Built Britain.
- Defining the digital twin: seven essential steps.
- Digital engineering.
- Digital Built Britain v BIM.
- Digital information.
- Digital model.
- Digital technology.
- Digital twin.
- Digitalisation.
- Digitisation.
- Digitise.
- How to make the digital revolution a success.
- Immersive Hybrid Reality IHR.
- Internet of things.
- Smart contracts.
- UK digital strategy.
Featured articles and news
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
[[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DConstruction_contract_awards_down_1bn%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Construction contract awards down £1bn]]
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.