Design build operate (DBO)
A design build operate (DBO) contract is a project delivery model in which a single contractor is appointed to design and build a project and then to operate it for a period of time.
The common form of such a contract is a public private partnership (PPP), in which a public client (e.g. government or public agency) enters into a contract with a private contractor to design, build and then operate the project, while the client finances the project and retains ownership.
This differs from a design build finance and operate (DBFO) contract in which the contractor also finances the project and leases it to the client for an agreed period (perhaps 30 years) after which the development reverts to the client.
It also differs from the traditional design and build contract in that it includes operation and maintenance of the completed works, which means that the contractor’s duties and responsibilities to the client do not end at final acceptance but continue through a defined operational term.
In theory, this encourages the contractor to develop a project with its long-term performance in mind from the outset, rather than just considering the efficiency of its construction, as the contractor will be responsible for any high operating, maintenance or repairs bills. However, it ties both the client and the contractor into a very long-term relationship that can be difficult to price. As a result, contractors may price considerable risk into their tenders, and so the client may not always achieve a best value outcome.
NEC4 Design, Build and Operate Contract (DBO) was released in 2017. This is not only intended for the 'traditional' DBO approach, but is also available for situations in which a client wants to have an existing facility or asset operated by the contractor while it is being upgraded or extended.
[edit] Related articles on Designing Buildings Wiki
- Build lease transfer BLT.
- Build, own, operate and transfer (BOOT).
- Complex project.
- Construction contractor.
- Construction management.
- Design and build.
- Design and build - pros and cons.
- Design build finance and operate.
- Design Build Finance Transfer (DBFT).
- Design build operate maintain DBOM.
- Integrated project delivery (IPD).
- Major project construction contract.
- NEC4 Design, Build and Operate Contract.
- Private Finance Initiative.
- Procurement route.
- Public Private Partnership.
- Public procurement.
- Renovate, operate, transfer (ROT).
- Risk allocation.
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.