[edit] Introduction
A decision-making unit (DMU) is a team of people within an organisation who play a role in the business-purchase decision-making process for products and services. It is sometimes referred to as the ‘buying centre’ of an organisation.
The term decision-making unit originates in B2B marketing but has now spread into consumer and service applications. .
Typically, a decision-making unit may comprise:
- Specifiers – usually define the sort of product that is required, possibly using broad-brush-stroke outlines.
- Influencers – usually have a persuasive role in the decision-making process. They can set preconditions which may be as a result of their knowledge and experience. They may be consultants employed by the organisation to help the decision-making process. Informal influencers can include acquaintances, friends and family members.
- Buyers – responsible for purchasing, sourcing and negotiating with suppliers.
- Gatekeepers – usually search for information, determine what type of information will be delivered to certain players and pass it on to decision makers further up the line. Can strongly influence the decision-making process.
- Deciders – e.g senior managers who have the final say, make the final deal, ultimately responsible for choosing the supplier or the decision, placing the order having reviewed information passed on from those further down the line.
- Users – these can be both employees and customers. Because they use the goods and services, their feedback can exert influence on the specification of future products.
Not all of the above roles will be involved in some decisions and it is also possible that one person may perform more than one role. Decision-making powers may not be evenly spread throughout the DMU: some may have more authority than others
[edit] The construction DMU
The typical DMU in the construction sector is more complex than those in B2B markets. This is usually because the team responsible for designing, selecting, buying and installing products is usually specially compiled for a single project.
The key players in a construction-sector DMU may include:
- Client: A construction client (e.g property developer) may have some or total influence on product selection due to various factors e.g prestige or existing supply arrangements.
- Architect: Usually initiates the specification process. Combines various factors such as the needs of the client, building performance criteria, regulations, risks, operational needs, sustainability and so on.
- Engineer: Often provides information on new technology and designs and specifies specialist products such as steel and concrete, types of bolt, rebar and so on.
- Quantity surveyor: May make product recommendations and can be found at different roles in the construction process e.g client representation, project manager, contractor, specification writing, etc. May also oversee value for the client.
- Main contractor: In traditional forms of contract, the main contractor typically has limited influence on product selection. However, in design and build and other forms, the contractor may influence or direct the architect’s and engineer’s product selection. The contractor may have their own complete DMU with members who perform the decision-making-unit roles listed above
- Specialist supplier: May advise the architect and client on design and may make the final decision on product selection for a performance specification
- Facilities manager: The facilities manager’s experience plays an important role in product selection in relation to maintenance and operation and lifetime operating costs.
- Other: Other contributors may include stakeholders and third parties.
[edit] Related articles on Designing Buildings
- Benchmarking.
- Best value.
- Budget.
- Decision maker.
- Delegated authority.
- Integrated project team.
- Investment decision maker for building design and construction
- Leverage.
- Market value.
- Overcoming difficulties in value management.
- Public procurement.
- Senior responsible owner.
- Specification.
- Stakeholders.
- Value added.
- Value engineering.
- Value management.
Featured articles and news
Encourage individuals to take action to save water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
[[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DConstruction_contract_awards_down_1bn%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Construction contract awards down £1bn]]
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.