Category B fit-out works
Rules of Thumb, Guidelines for building services (5th Edition) BG 9/2011, by Glenn Hawkins, published by BSRIA in 2011, states: ‘Category B works, or bespoke fit-out, may include:
- Suspended ceiling upgrades
- Special area fitting out, such as auditoria, kitchens, restaurants and meeting rooms
- Upgrade to core finishes
- Internal partitioning
- Additional floor finishes
- Mechanical, electrical and lighting upgrades
- Installation of below-floor and overhead/drop-down power distribution
- IT and telecommunications installations and distribution (data cabling)
- Enhanced WC provision, if required
- Occupier standby generation and uninterruptible power supplies (UPS)
- Adaptation of life safety systems
- Decoration and branding
- Fixtures and fittings
- Furniture
- Security installation enhancements
- Audio-visual installations
- Corporate and way-finding signage
- Vertical transportation enhancements
- Feature staircase links between floors’
--BSRIA
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Dorset's first conservation campaigner?
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.